13.07.2015 Views

National Energy Policy - Final Draft - 14 Nov 2013

National Energy Policy - Final Draft - 14 Nov 2013

National Energy Policy - Final Draft - 14 Nov 2013

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

to this worsening situation leading to a number of transformer failures and consequential poweroutages.3. The technical and commercial losses arising during the transmission and distribution ofelectricity are as provided in Table 4.6.Table 4.6 - Targeted Power System Loss Reduction Path2007/08(%)2008/09(%)2009/10(%)2010/11(%)2011/12(%)2012/13(%)<strong>2013</strong>/<strong>14</strong>(%)Total Losses 16.60 16.30 15.90 15.50 15.00 <strong>14</strong>.50 <strong>14</strong>.50Transmission losses 3.60 3.40 3.50 3.50 3.50 3.50 3.50Distribution losses 13.00 12.90 12.40 12.00 11.50 11.00 11.00Technical Losses 13.20 13.10 12.90 12.80 12.50 12.00 12.00Non-technical losses 3.40 3.20 3.00 2.80 2.50 2.50 2.50Projected Incremental Loss Reduction 1.30 0.30 0.40 0.40 0.50 0.50 0.00Source: KPLC Strategic Plan 2010/11 - 20<strong>14</strong>/154.5.2 Distribution Expansion Plan1. The objective of the ongoing <strong>Energy</strong> Access Scale-Up is to increase connectivity from 22% to30% by the year 20<strong>14</strong>. It involves expansion of the national power distribution grid to connectone million new customers in 5 years starting from 2009. The number of new electricityconsumers increased by 285,277 in 2011/12 and 292,337 in 2012/13.2. In addition, more projects have been initiated to enhance capacity, quality of supply and reducepower losses. These projects are expected to be completed during the medium term and coveramong others the following key areas:(a) Refurbishment of existing distribution network, establishment of new substations,installations of new distribution transformer, construction of new lines, implementation ofpilot distribution automation project.(b) Upgrade of Supervisory Control and Data Acquisition/<strong>Energy</strong> Management System(SCADA/EMS).(c) Improvement of the Geographical Information System (GIS) utility database by completingthe digitizing and mapping of the grid network.(d) Implementation of customer service improvement programs including roll out of AutomaticMeter Reading (AMR) for large customers and pre-paid meters for small to mediumcustomers.4.5.3 Distribution Plan 20<strong>14</strong>-20301. Programme to supply the forecast LCPDP demand and improve reliability involves subtransmissionat 132kV and 66kV and the discontinuation of 33kV sub-transmission. Distributionto urban and rural areas will largely continue at 11kV and 33kV respectively.2. By the year 2020, capacities of primary and distribution substations, HV lines and MV linesestimates are 11,888MVA, 190,204MVA, 7,925km and 118,875km respectively. In the year85 4.0 – ELECTRICITY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!