13.07.2015 Views

Untitled - MendelNet 2013 - Mendelova zemědělská a lesnická ...

Untitled - MendelNet 2013 - Mendelova zemědělská a lesnická ...

Untitled - MendelNet 2013 - Mendelova zemědělská a lesnická ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MENDELNET <strong>2013</strong>stream [9] and Kamenny stream [10] and it will create a migratory barrier along its whole length[11].The most significant during the operation phase will be discharging emissions and higher noisepollution.Map 2 The ecological significance 2 km around planned ring road (variant 1 alternative 2)I/64 Kľače-ŠujaWe have suggested some mitigation measures which could eliminate (reduce) these negativeimpacts and preserve (raise) its ecological stability as a result of our findings about the mostimportant landscape structural elements, the overall ecological stability of the affected area and themain important impacts of proposed road. We mention some of them in our contribution such asfence the important habitats and genofond localities, built bridge over the road in the places whereit directly crosses the valuable ecosystem mentioned above, plant new trees not only as acompensation for cutting some existing ones but also as noise barrier along the road [11], preservemigratory corridors on the local streams wide enough [12] etc. We also propose biota monitoringnot only before construction but even during the construction phase and at the initial part of theoperation phase as an important mitigation step.431 | P age

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!