13.07.2015 Views

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

New or re-development should adopt exemplar source control SUDS techniques toreduce the risk of frequent low impact flooding due to post-development runoff.Onsite attenuation schemes would need to be tested against the hydrograph of thereceiving watercourse to ensure flows are not exacerbated downstream within thecatchment.The site falls within an area indicated to potentially be susceptible to groundwateremergence. Further assessment of groundwater risk would be required and anassessment of suitable surface water mitigation techniques should be made at thedetailed FRA level.All current access roads to the site, The right arm of the A44 Bromyard road, theA4440 Grove Way, Tudor Way and the Oldbury road, some of the main accessroads to the site, are at risk from fluvial flooding are at risk from fluvial flooding and \or surface water. Suitable alternative access arrangements away from thefloodplain will need to be investigated further.Demonstration that development at this location can be made safe.2012s5947 S <strong>Worcestershire</strong> Level 2 SFRA Update FINAL Report v1.0.doc 93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!