- Page 1: 2012s5947 South WorcestershireStrat
- Page 5 and 6: AcknowledgementsJBA Consulting woul
- Page 9 and 10: List of FiguresFigure 1-1: SFRA stu
- Page 11 and 12: Abbreviations and Glossary of Terms
- Page 13 and 14: 1 Introduction1.1 About this report
- Page 15 and 16: Figure 1-1: SFRA study extent2012s5
- Page 17 and 18: oooRiver SalwarpeBarbourne BrookKyr
- Page 19 and 20: This page is intentionally left bla
- Page 21 and 22: Council), although there is flexibi
- Page 23 and 24: surface water management strategy i
- Page 25 and 26: Figure 2-2: Strategic Planning Link
- Page 27 and 28: 3.2.2 HydrologyAccording to the Riv
- Page 29 and 30: This page is intentionally left bla
- Page 31 and 32: oflooding. Additionally, if there i
- Page 33 and 34: Floodplain [“Blue Zone”]Develop
- Page 35 and 36: 4.3.3 Substitute, Control and Mitig
- Page 37 and 38: 5.1.4 Hazard MapsHazard mapping has
- Page 39 and 40: Stage 2 - Defining the Evidence Bas
- Page 41 and 42: It must be demonstrated that the de
- Page 43 and 44: Figure 6-1: Proposed Worcester Allo
- Page 45 and 46: 6.2.4 MalvernFigure 6-4: Proposed M
- Page 47 and 48: Development at Tenbury Wells is lim
- Page 49 and 50: This page is intentionally left bla
- Page 51 and 52: mapping. To understand the risk of
- Page 53 and 54:
7.3 Groundwater AssessmentThe Envir
- Page 55 and 56:
Sources of Flood Risk:The main sour
- Page 57 and 58:
Table 7-4: 37-N17 (Land to the nort
- Page 59 and 60:
SUDS and the development site:SUDS
- Page 61 and 62:
Sources of Flood Risk:Primary flood
- Page 63 and 64:
Table 7-6: 69_05 (Land adjacent to
- Page 65 and 66:
Estimated Attenuation Storage Volum
- Page 67 and 68:
Sources of Flood Risk:The main sour
- Page 69 and 70:
Table 7-8: MHWD10 (Land at The Phea
- Page 71 and 72:
surface water flood risk. The A4104
- Page 73 and 74:
Table 7-9: SWDP6/NEWB (A44 Service
- Page 75 and 76:
Estimated Attenuation Storage Volum
- Page 77 and 78:
Sources of Flood Risk:The main sour
- Page 79 and 80:
Table 7-11: WO93 (Henwick Road/Cheq
- Page 81 and 82:
Estimated Attenuation Storage Volum
- Page 83 and 84:
Sources of Flood Risk:Primary flood
- Page 85 and 86:
Table 7-13: SWDP6/19 (Perdiswell (L
- Page 87 and 88:
SUDS and the development site:SUDS
- Page 89 and 90:
Sources of Flood Risk:Primary flood
- Page 91 and 92:
Table 7-15: SWDP7/6 (Sidbury)OS NGR
- Page 93 and 94:
Estimated Attenuation Storage Volum
- Page 95 and 96:
Sources of Flood Risk:Primary flood
- Page 97 and 98:
New or re-development should adopt
- Page 99 and 100:
Sources of Flood Risk:Primary flood
- Page 101 and 102:
New or re-development should adopt
- Page 103 and 104:
Sources of Flood Risk:Primary flood
- Page 105 and 106:
catchment.The site falls within an
- Page 107 and 108:
Sources of Flood Risk:Primary flood
- Page 109 and 110:
The site falls within an area indic
- Page 111 and 112:
Sources of Flood Risk:The main sour
- Page 113 and 114:
Table 7-21: SWDP9/6 (Willow Court,
- Page 115 and 116:
Greenfield Runoff Rate (l/s/ha)Esti
- Page 117 and 118:
Sources of Flood Risk:Primary flood
- Page 119 and 120:
Table 7-23: SWDP11/4 (Employment Si
- Page 121 and 122:
Estimated Attenuation Storage Volum
- Page 123 and 124:
Sources of Flood Risk:Primary flood
- Page 125 and 126:
emergence. Further assessment of gr
- Page 127 and 128:
Sources of Flood Risk:Primary flood
- Page 129 and 130:
The site falls within an area indic
- Page 131 and 132:
Sources of Flood Risk:Primary flood
- Page 133 and 134:
Table 7-27: SWDP16 (Three Counties
- Page 135 and 136:
the site are at risk from surface w
- Page 137 and 138:
Table 7-28: SWDP18/1 (Garage, High
- Page 139 and 140:
Estimated Attenuation Storage Volum
- Page 141 and 142:
Sources of Flood Risk:Primary flood
- Page 143 and 144:
Table 7-30: SWDP19/1 (Station Road/
- Page 145 and 146:
Surface water presents a risk to th
- Page 147 and 148:
Table 7-31: SWDP23/24 (Land adjacen
- Page 149 and 150:
Estimated Attenuation Storage Volum
- Page 151 and 152:
Sources of Flood Risk:Primary flood
- Page 153 and 154:
Table 7-33: SWDP23/27 Land behind t
- Page 155 and 156:
Estimated Attenuation Storage Volum
- Page 157 and 158:
Sources of Flood Risk:The main sour
- Page 159 and 160:
Table 7-35: SWDP24/9 Littlebrook Nu
- Page 161 and 162:
Estimated Attenuation Storage Volum
- Page 163 and 164:
Sources of Flood Risk:The main sour
- Page 165 and 166:
eceiving watercourse to ensure flow
- Page 167 and 168:
Sources of Flood Risk:The main sour
- Page 169 and 170:
Table 7-38: SWDP24/23 (Land north o
- Page 171 and 172:
SUDS and the development site:SUDS
- Page 173 and 174:
Sources of Flood Risk:Primary flood
- Page 175 and 176:
educe the risk of frequent low impa
- Page 177 and 178:
Sources of Flood Risk:Primary flood
- Page 179 and 180:
Onsite attenuation schemes would ne
- Page 181 and 182:
FRAs for proposed development in th
- Page 183 and 184:
The design, construction and ongoin
- Page 185 and 186:
8.7.3 Raised DefencesConstruction o
- Page 187 and 188:
8.9 Making development safe8.9.1 Sa
- Page 189 and 190:
This page is intentionally left bla
- Page 191 and 192:
9.1.3 Protection and Enhancement of
- Page 193 and 194:
This page is intentionally left bla
- Page 195 and 196:
This page is intentionally left bla
- Page 197 and 198:
This page is intentionally left bla
- Page 199 and 200:
This page is intentionally left bla
- Page 201 and 202:
This page is intentionally left bla
- Page 203 and 204:
D.1 30 years2012s5947 S Worcestersh
- Page 205 and 206:
This page is intentionally left bla
- Page 207 and 208:
This page is intentionally left bla
- Page 209 and 210:
This page is intentionally left bla
- Page 211 and 212:
G.1 Property counts for South Worce
- Page 213 and 214:
This page is intentionally left bla
- Page 215 and 216:
Key SFRA meetings and communication