13.07.2015 Views

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sources of <strong>Flood</strong> <strong>Risk</strong>:Primary flood risk to the site is fluvial, resulting from overtopping of the unnamedtributaries of the Laughern Brook, confined to the lakes and channels to the north,west and central parts of the site. The central and northern parts of the site fallswithin <strong>Flood</strong> Zone 3b and the Blue Zone of the Policy Maps. The right arm of theA44 Bromyard road, the A4440 Grove Way, Tudor Way and the Oldbury road, someof the main access roads to the site, are at risk from fluvial flooding.Surface water presents a risk to the site. Further development and creation ofimpermeable surfaces may result in an increase of surface water flood risk. The2012s5947 S <strong>Worcestershire</strong> Level 2 SFRA Update FINAL Report v1.0.doc 91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!