13.07.2015 Views

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NRDOrdinary WatercourseOS NGRPFRAPitt ReviewPPGPPS25ReFHResilience MeasuresResistance Measures<strong>Risk</strong>Return PeriodSABSewer floodingSHLAASFRAStakeholderSPRHOSTSUDSSurface water floodingSWMPWCCWDCWFDNational Receptor Dataset – a collection of risk receptors produced by theEnvironment AgencyAll watercourses that are not designated Main River. Local Authorities or, wherethey exist, IDBs have similar permissive powers as the Environment Agency inrelation to flood defence work. However, the riparian owner has the responsibilityof maintenance.Ordnance Survey National Grid ReferencePreliminary <strong>Flood</strong> <strong>Risk</strong> <strong>Assessment</strong>Comprehensive independent review of the 2007 summer floods by Sir Michael Pitt,which provided recommendations to improve flood risk management in England.Planning Policy Guidance – superseded by the NPPFPlanning and Policy Statement 25: Development and <strong>Flood</strong> <strong>Risk</strong>Revitalised <strong>Flood</strong> HydrographMeasures designed to reduce the impact of water that enters property andbusinesses; could include measures such as raising electrical appliances.Measures designed to keep flood water out of properties and businesses; couldinclude flood guards for example.In flood risk management, risk is defined as a product of the probability or likelihoodof a flood occurring, and the consequence of the flood.Is an estimate of the interval of time between events of a certain intensity or size, inthis instance it refers to flood events. It is a statistical measurement denoting theaverage recurrence interval over an extended period of time.SUDS Approval Body - responsible for approving, adopting and maintainingdrainage plans and SUDS schemes that meet the National Standards<strong>Flood</strong>ing caused by a blockage or overflowing in a sewer or urban drainagesystem.<strong>Strategic</strong> Housing Land Availability <strong>Assessment</strong> - The <strong>Strategic</strong> Housing LandAvailability <strong>Assessment</strong> (SHLAA) is a technical piece of evidence to support theSWDP and Sites & Policies Development Plan Documents (DPDs). Its purpose isto demonstrate that there is a supply of housing land in the District which is suitableand deliverable.<strong>Strategic</strong> <strong>Flood</strong> <strong>Risk</strong> <strong>Assessment</strong>A person or organisation affected by the problem or solution, or interested in theproblem or solution. They can be individuals or organisations, includes the publicand communities.Standard Percentage Runoff (%) associated with each HOST soil classSustainable Drainage Systems - Methods of management practices and controlstructures that are designed to drain surface water in a more sustainable mannerthan some conventional techniques<strong>Flood</strong>ing as a result of surface water runoff as a result of high intensity rainfall whenwater is ponding or flowing over the ground surface before it enters theunderground drainage network or watercourse, or cannot enter it because thenetwork is full to capacity, thus causing what is known as pluvial flooding.Surface Water Management Plan - The SWMP plan should outline the preferredsurface water management strategy and identify the actions, timescales andresponsibilities of each partner. It is the principal output from the SWMP study.Worcester City CouncilWychavon District CouncilWater Framework Directive2012s5947 S <strong>Worcestershire</strong> Level 2 SFRA Update FINAL Report v1.0.doc 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!