13.07.2015 Views

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUDS and the development site:SUDS TypeSource ControlInfiltrationDetentionFiltrationConveyancePotentialSuitabilityCommentsAll source control techniques are likely to be suitableMapping suggests underlying soil is unlikely to be permeable. A siteinvestigation should be carried out to assess suitability of drainage byinfiltrationMapping suggests that site slopes may be steep, larger ‘aboveground’ features may not be viableAll filtration techniques are likely to be suitableAll conveyance techniques are likely to be suitable<strong>Flood</strong> Defences:None.The site is not located within a groundwater source protection zone.Residential developments should provide at least two independent SUDS features inseries to provide a suitable level of water quality treatment.Effects of Climate Change:Increased rainfall intensity. Increased water levels in the unnamed tributary of the CarrantBrook.<strong>Flood</strong> <strong>Risk</strong> Implications for Development:All development should be located within <strong>Flood</strong> Zone 1, unless appropriate inaccordance with NPPF Technical Guidance.A detailed site-specific flood risk assessment, including hazard mapping, will berequired for any development in <strong>Flood</strong> Zone 2, or for sites greater than 1ha in <strong>Flood</strong>Zone 1.Redevelopment of the side is proposed to focus on residential uses.Resilience measures will be required if buildings are situated in the flood risk area.Green infrastructure should be considered within the mitigation measures for surfacewater runoff from potential development.<strong>Assessment</strong> for runoff should include allowance for climate change effects.New or re-development should adopt exemplar source control SUDS techniques toreduce the risk of frequent low impact flooding due to post-development runoff.Onsite attenuation schemes would need to be tested against the hydrograph of thereceiving watercourse to ensure flows are not exacerbated downstream within thecatchment.The site falls within an area indicated to potentially be susceptible to groundwateremergence. Further assessment of groundwater risk would be required and anassessment of suitable surface water mitigation techniques should be made at thedetailed FRA level.Access needs would need to be outside of the floodplain, onto the southern branchof the B4632 Station Road and \ or the Green Road.Demonstration that development at this location can be made safe.2012s5947 S <strong>Worcestershire</strong> Level 2 SFRA Update FINAL Report v1.0.doc 163

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!