13.07.2015 Views

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

Strategic Flood Risk Assessment - South Worcestershire ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Surface water presents a risk to the site. Further development and creation ofimpermeable surfaces may result in an increase of surface water flood risk. TheA4104 Station Road and the B4083 Wyre Road, the main access roads to the site,are at risk from surface water.Surface Water Drainage:As an indication of requirements to manage surface water runoff at the development site anassessment of the soil types, greenfield runoff rate and attenuation storage volume is includedbelow. Storage volumes displayed are calculated with an assumption that 75% of the site will bedeveloped impermeable ground. A 25% increase in rainfall depths has been included torepresent predicted future climate change effects.PLEASE NOTE: This assessment has been carried out using broad-scale datasets and aims toprovide an indication of the likely opportunities and constraints for this development site. Adetailed drainage assessment based on site-specific conditions should be carried out by asuitably qualified professional and submitted with any planning application. The values belowshould not be used for design purposes.Soil TypeGreenfield Runoff Rate (l/s/ha)Unknown – More Permeable1 in 2 year 51 in 100 year (plus climate change) 19.3Estimated Attenuation Storage Volume (m 3 ) 9,080 – 13,030SUDS and the development site:SUDS TypeSource ControlInfiltrationDetentionFiltrationConveyancePotentialSuitabilityCommentsAll source control techniques are likely to be suitableMapping suggests underlying soil is likely to be permeable. Howeverthere is a risk of groundwater flooding. A site investigation should becarried out to assess suitability of drainage by infiltrationDetention techniques may be suitable if a non-permeable liner isprovided to prevent the ingress of groundwaterAll filtration techniques are likely to be suitableAll conveyance techniques are likely to be suitableThis site is located within a flooding hotspot so all efforts should be made tominimise the rate and volume of runoff leaving the site.The site is not located within a groundwater source protection zone.Commercial, recreational and leisure developments should provide at least twoindependent SUDS features in series to provide a suitable level of water qualitytreatment.<strong>Flood</strong> Defences:A flood defence scheme for the Pershore area.Effects of Climate Change:Increased rainfall intensity. Increased water levels in the unnamed tributaries of the River Avon.<strong>Flood</strong> <strong>Risk</strong> Implications for Development:All development should be located within <strong>Flood</strong> Zone 1, unless appropriate inaccordance with NPPF Technical Guidance.A detailed site-specific flood risk assessment, including hazard mapping, will berequired for any development in <strong>Flood</strong> Zone 2, or for sites greater than 1ha in <strong>Flood</strong>Zone 1.Redevelopment or alternative use of the site will focus on commercial, recreationaland leisure uses, either singly or as mixed use proposals.Resilience measures will be required if buildings are situated in the flood risk area.Green infrastructure should be considered within the mitigation measures for surfacewater runoff from potential development.<strong>Assessment</strong> for runoff should include allowance for climate change effects.2012s5947 S <strong>Worcestershire</strong> Level 2 SFRA Update FINAL Report v1.0.doc 137

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!