09.08.2015 Views

Installation Operation and Maintenance Manual

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Maintenance</strong> (Continued)4. Check the frame-face runout by rotating the shaft so that the indicator measures the fit for 360º.If the total indicator reading is greater than 0.001 in. (0.025 mm), then disassemble <strong>and</strong> determine thecause.SCALE 0.1505. Place the manila gasket (360D) on the frame (228), <strong>and</strong> hold the gasket in place by inserting the dowelpins (469B) in their holes.The gasket is designed to fit only one way.6. Install the frame adapter.a) Place the frame adapter (108) onto the frame assembly.b) Align the bolt holes <strong>and</strong> dowel locations on the frame adapter with the bolt holes <strong>and</strong> dowellocations on the frame.98 Model 3796 i-FRAME <strong>Installation</strong>, <strong>Operation</strong>, <strong>and</strong> <strong>Maintenance</strong> <strong>Manual</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!