09.08.2015 Views

Installation Operation and Maintenance Manual

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Maintenance</strong> (Continued)1013. Loosen the clamp bolts (370C) <strong>and</strong> the jack bolts (370D).4. Measure the gap between the impeller (101) <strong>and</strong> the seal chamber <strong>and</strong> stuffing-box cover (184) with afeeler gauge.423370C370D5. When you reach a 0.030 in. (0.76 mm) clearance, tighten the clamp bolts (370C), jack bolts (370D),<strong>and</strong> lock nuts (423).This approximates the impeller position when it is set to 0.015 in. (0.38 mm) from the casing. Performa final impeller adjustment after you install the impeller into the casing.6. Check the impeller (101) runout.Check vane tip to vane tip. If the total indicator reading is greater than 0.005 in. (0.13 mm), determinethe cause <strong>and</strong> correct the issue before you proceed.Model 3796 i-FRAME <strong>Installation</strong>, <strong>Operation</strong>, <strong>and</strong> <strong>Maintenance</strong> <strong>Manual</strong> 107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!