Installation Operation and Maintenance Manual
Installation Operation and Maintenance Manual (IOM) - Goulds Pumps
Installation Operation and Maintenance Manual (IOM) - Goulds Pumps
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Installation</strong> (Continued)Example: Discharge piping equipmentCorrectIncorrect4312211. Bypass line2. Shut-off valve3. Check valve4. Discharge isolation valve1. Check valve (incorrect position)2. The isolation valve should not be positionedbetween the check valve <strong>and</strong> the pump.Baseplate-mounting proceduresPrepare the baseplate for mounting1. Remove all the attached equipment from the baseplate.2. Clean the underside of the baseplate completely.3. If applicable, coat the underside of the baseplate with an epoxy primer.Use an epoxy primer only if you used an epoxy-based grout.4. Remove the rust-proofing coat from the machined mounting pads using an appropriate solvent.5. Remove water <strong>and</strong> debris from the foundation-bolt holes.Install the baseplate using shims or wedgesRequired tools:• Two sets of shims or wedges for each foundation bolt• Two machinist's levels• Baseplate-leveling worksheetThis procedure is applicable to cast iron <strong>and</strong> fabricated steel baseplates.1. If you use sleeve-type bolts, fill the bolt sleeves with packing material or rags to prevent grout fromentering the bolt holes.2. Put the sets of wedges or shims on each side of each foundation bolt.The sets of wedges should have a height of between 0.75 in. (19 mm) <strong>and</strong> 1.50 in. (38 mm).32 Model 3796 i-FRAME <strong>Installation</strong>, <strong>Operation</strong>, <strong>and</strong> <strong>Maintenance</strong> <strong>Manual</strong>