09.08.2015 Views

Installation Operation and Maintenance Manual

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Maintenance</strong> (Continued).030101For more information on how to set the impeller clearances, refer to the Impeller-clearance checks <strong>and</strong>Impeller-clearance setting sections in Commissioning, Startup, <strong>Operation</strong>, <strong>and</strong> Shutdown.Attach the i-ALERT Condition Monitor to the pumpCAUTION:Always wear protective gloves. The pump <strong>and</strong> condition monitor can be hot.Tools required:• 5/32 inch hex wrench1. Attach the condition monitor (761B) to the bearing frame (228A) using the hex-head screw (372T)provided.761B372T228A2. Tighten the hex-head screw with a 5/32 inch hex wrench to 6 ft-lbs (8 Nm).108 Model 3796 i-FRAME <strong>Installation</strong>, <strong>Operation</strong>, <strong>and</strong> <strong>Maintenance</strong> <strong>Manual</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!