09.08.2015 Views

Installation Operation and Maintenance Manual

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11. Remove the outboard labyrinth oil seal (332A) from the bearing housing (134).<strong>Maintenance</strong> (Continued)Remove the O-rings (497F <strong>and</strong> 497G) if it is necessary. Labyrinth oil seal O-rings are part of the 3196maintenance kits <strong>and</strong> they are sold separately.497F497G332ADisassemble the power end ( LTi )1. Remove the clamp screws (370C) <strong>and</strong> back off the jam nuts (423).2. Evenly tighten the jack screws (370D) to move the bearing housing (134) out of the bearing frame(228A).3. Remove the shaft assembly from the bearing frame (228A).370D423134228A370C4. Remove the jack screws (370D) with the nuts (423).5. Remove the clamp-ring screws (236A) <strong>and</strong> separate the clamp ring (253B) from the bearing housing(134).You must remove the bearings before you can remove the clamp ring from the shaft.112A370D423236A253B1346. Remove the bearing housing (134) <strong>and</strong> the bearings (112A <strong>and</strong> 168A) from the shaft (122).Model 3796 i-FRAME <strong>Installation</strong>, <strong>Operation</strong>, <strong>and</strong> <strong>Maintenance</strong> <strong>Manual</strong> 79

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!