09.08.2015 Views

Installation Operation and Maintenance Manual

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

Installation Operation and Maintenance Manual (IOM) - Goulds Pumps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Maintenance</strong> (Continued)Post-assembly checksPerform these checks after you assemble the pump, then continue with pump startup:• Rotate the shaft by h<strong>and</strong> in order to make sure that it rotates easily <strong>and</strong> smoothly <strong>and</strong> that there is norubbing.• Open the isolation valves <strong>and</strong> check the pump for leaks.Install the back pull-out assembly (except HT 3196)CAUTION:Never remove the back pull-out assembly without assistance.1. Clean the casing fit <strong>and</strong> install the casing gasket (351) on the seal chamber <strong>and</strong> stuffing-box cover.2. Loosen the clamping bolts (370C) <strong>and</strong> jack bolts (370D) on the bearing housing.423370C370D3. Install the back pull-out assembly in the casing.Model 3796 i-FRAME <strong>Installation</strong>, <strong>Operation</strong>, <strong>and</strong> <strong>Maintenance</strong> <strong>Manual</strong> 109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!