03.09.2015 Views

A1A - EIL Tender portal

A1A - EIL Tender portal

A1A - EIL Tender portal

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VENDOR DATA REQUIREMENTS<br />

FOR<br />

SILENCER<br />

Document No.<br />

A307-0IG-16-46-VDR-6519<br />

Rev. A<br />

Page 3 of 3<br />

S.<br />

N<br />

O.<br />

DESCRIPTION<br />

21. PACKING AND FORWARDING<br />

INSTRUCTIONS @<br />

22. FILLED IN DATA SHEET<br />

WITH<br />

BID<br />

FOR<br />

REVIEW<br />

POST ORDER<br />

FOR<br />

RECORD<br />

WITH<br />

DATA<br />

BOOK<br />

(FINAL)<br />

REMARKS<br />

23. CATALOGUES/OUTLINE DRG. OF THE<br />

SILENCER WITH MOC OF CRITICAL PARTS<br />

24. INSTALLATION, OPERATION &<br />

MAINTENANCE MANUAL<br />

Notes :<br />

1. "TICK" denotes applicability.<br />

2. Post order, drawing / document review shall commence only after approval of Document Control Index (DCI).<br />

3. All post order documents shall be submitted / approved through <strong>EIL</strong> eDMS <strong>portal</strong>.<br />

4. Final documentation shall be submitted in hard copy (Six prints) and soft ( two CDs/DVDs ) in addition to<br />

submission through <strong>EIL</strong> eDMS.<br />

5. Refer - 6-78-0001: Specification for quality management system from Bidders.<br />

6. Refer - 6-78-0002: Specification for documentation requirements from Contractors.<br />

7. All drawings & documents shall be submitted in A4 or A3 paper sizes. Documents in higher paper size shall<br />

be submitted in exceptional circumstances or as indicated in the MR/<strong>Tender</strong>.<br />

8. Post order- The schedule of drawing / data submission shall be mutually agreed between <strong>EIL</strong> & the bidder /<br />

contractor / supplier during finalization of Document Control Index (DCI).<br />

9. "@" indicates submission of documents to Inspection Agency.<br />

10. Bill of Material shall form part of the respective drawing.<br />

11. @ These documents shall be reviewed by <strong>EIL</strong>'s regional procurement office (RPO)pertaining to vendor's<br />

region<br />

Format No. <strong>EIL</strong>-1642-1924 Rev.1<br />

Copyright <strong>EIL</strong> - All rights reserved<br />

Page 150 of 291

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!