BPCL-KR<br />

Job: A307<br />

1.8.4 All payments shall be released either through Electronic Clearing System (ECS) / Electronic Fund<br />

Transfer (EFT)/ Real Time Gross Settlement (RTGS) or through internet, within 30 days of receipt of<br />

Invoice and all requisite documents, complete in all respects.<br />

1.8.5 Billing schedule shall be submitted to <strong>EIL</strong> & BPCL by the Supplier for approval within 30 days from<br />

the date of Purchase Order wherever specified therein. No payment against pro-rata dispatch shall<br />

be made without approval of Billing Schedule.<br />

1.8.6 Major Raw Material: Shall be as specified below:<br />

i. Columns and Vessels: Plates and Forgings<br />

ii.<br />

iii.<br />

iv.<br />

Heat Exchangers: Plates, Forgings and Tubes<br />

Pumps/Compressors: Castings and Drivers<br />

Any other item(s) as may be defined in MR/PR.<br />

2.0 PAYMENT TERMS FOR FOREIGN BIDDERS:<br />

2.1 Where the Material Requisition is only for Supply of materials<br />

2.1.1 100% of FOB Order Value shall be paid through an Irrevocable Letter of Credit against submission<br />

of Shipping Documents. The Letter of Credit shall be established only on receipt of acceptance of<br />

Fax of Acceptance/Purchase Order along with submission of Bank Guarantee of 15% of Order Value<br />

(10% towards Performance Bank Guarantee valid till full Guarantee period plus Three months claim<br />

period & separate 5% Bank Guarantee towards Price Reduction Schedule due to delay in delivery<br />

valid till contractual delivery date (CDD) + Five and half Months).<br />

For PGTR cases only<br />

In case of PGTR 90% supply amount shall be released through Letter of Credit and last 10% supply<br />

amount shall be released against successful demonstration of Performance Guarantee Test Run &<br />

submission of Invoices duly certified by Site-In-charge or 6 months from receipt of material at site<br />

(against BG of equivalent amount valid for 1 year), whichever is earlier. However in the event of<br />

delay in conducting the PGTR, the bidder is not relieved of his responsibility to carry out the same.<br />

No additional payment shall be made for visit of supplier to site for demonstrating the PGTR, if the<br />

same is included in the scope of supplier.<br />

2.2 Where the Material Requisition calls for Supply of material and Erection or Site Work in the<br />

scope of Supplier and Package Items<br />

For Supply Portion<br />

2.2.1 90% Payment of FOB Supply value through an Irrevocable Letter of Credit against submission of<br />

Shipping Documents. The Letter of Credit shall be established only on receipt of acceptance of Fax<br />

of Acceptance/Purchase Order along with submission of Bank Guarantee of 15% of Order Value<br />

(10% towards Performance Bank Guarantee valid till full Guarantee period plus Three months claim<br />

period & separate 5% Bank Guarantee towards Price Reduction Schedule due to delay in delivery<br />

valid till contractual delivery date (CDD) + Five and half Months).<br />

2.2.2 10% Payment of FOB Supply value through direct wire transfer through banking channels on<br />

completion of Erection or Site Work or Commissioning/Performance Guarantee Test Run (PGTR) at<br />

site, as applicable as per Purchase Order/Purchase Requisition (PR) against submission of final<br />

documents or Certificate of Completion of Work by BPCL Site.<br />

For PGTR cases only<br />

The above amount (10%) shall be released against successful demonstration of Performance<br />

Guarantee Test Run & submission of Invoices duly certified by Site-In-charge or 6 months from<br />

receipt of material at site (against BG of equivalent amount valid for 1 year), whichever is earlier.<br />

However in the event of delay in conducting the PGTR, the bidder is not relieved of his responsibility<br />

to carry out the same. No additional payment shall be made for visit of supplier to site for<br />

demonstrating the PGTR, if the same is included in the scope of supplier.<br />

For Site Work Portion (Erection/Commissioning/PGTR)<br />

2.2.3 100% Payment of Amount for Erection or Site Work or Commissioning/Performance Guarantee Test<br />

Run (PGTR) at site, shall be paid through direct wire transfer through banking channels on<br />

completion of Erection or Site Work at site as per Purchase Order against submission of Certificate<br />

for Completion of Work by <strong>EIL</strong> Site.<br />

The Letter of Credit shall be established only on receipt of acceptance of Fax of<br />

Acceptance/Purchase Order along with submission of Performance Bank Guarantee of 15% of Total<br />

Order Value [Supply+Site Work] (10% towards Performance Bank Guarantee valid till full Guarantee<br />

A307_SIB Rev.5 dtd: 20.06.2013 Page 5 of 21<br />