Job Specification<br />

For<br />

Silencer<br />

DOCUMENT No.<br />

A307-16-46-SP-6519<br />

Rev. A<br />

Page 4 of 5<br />

4.11 The size and weight of the equipment shall preferably be kept minimum.<br />

4.12 The silencer shall be provided with lifting lugs for ease of installation at site.<br />

4.13 Allowable loads on Silencer Inlet Nozzle:<br />

Wherever piping is connected directly to silencer nozzles local load analysis<br />

calculations for shell/ head to nozzle junction to be carried-out as per WRC-107.<br />

Allowable loading shall be considered as per doc no- A307-0IG-16-46-ST-0038.<br />

Above loading are maximum. However in some exceptional cases if actual forces and<br />

moment values due to connected piping are more, this will be intimated to vendor<br />

during detail engineering. Vendor shall make necessary changes required for<br />

strengthening the nozzles & the supporting brackets.<br />

4.15 For Inlet Nozzle/ Flange, Drain Nozzle/ Flange: PMS attached in MR to be referred<br />

inline with P&IDs.<br />

For Gate Valve,: VMS attached in MR to be referred inline with P&IDs.<br />

4.16 For IBR Silencer ( IV-LZ-212), approval of drawings, documents, stagewise inspection<br />

and final certification of the equipment by Inspectorate of Boilers shall be included in<br />

bidder’s scope. Complete design of equipment as per IBR shall be carried out by<br />

vendor.<br />

4.17 Bidder to furnish the unit rates for addition/ deletion of the items (support<br />

brackets, nozzles, RF Pad, insert plate, nozzle flanges etc.) as per the doc. No.<br />

A307-16-46-UR-6519 attached with MR. (for changes due to piping loads, over<br />

and above those specified above, etc.).<br />

5.0 INSPECTION AND TESTING<br />

5.1 a) Equipment shall be inspected (stage wise & final) by <strong>EIL</strong>.<br />

b) Quoted prices shall include for the above<br />

5.2 Any or all the test, at purchaser's option shall be witnessed by purchaser / <strong>EIL</strong>.<br />

However, such inspection shall be regarded as check-up and shall in no way absolve<br />

the vendor of his responsibility.<br />

5.3 Testing at Bidder's works shall include but not limited to the following.<br />

Non-destructive tests such as Radiography, Dye Penetration Test etc. shall be<br />

followed for testing the welds. As a minimum all pressure parts of the silencers shall<br />

be spot radiographed as per ASME Code.<br />

All fillet welds shall be DP tested.<br />

5.4 Material certificates shall be furnished at the time of inspection.<br />

5.5 The silencer shall be tested at site for a period of 20 minutes for determining the<br />

guaranteed sound/Noise pressure level as specified in MDS under simulated<br />

operating conditions. The silencer shall be tested at site in the presence of Bidder’s<br />

representative and Bidder’s offer shall be deemed to include the same<br />

Format No. <strong>EIL</strong> 1641-1924 Rev. 1<br />

Page 185 of 291<br />

Copyright <strong>EIL</strong> – All rights reserved