JOB SPECIFICATION<br />
FOR SURFACE PREPARATION<br />
AND PROTECTIVE COATING<br />
JOB SPECIFICATION No.<br />
A307-000-06-42-PLS-01<br />
Rev.0<br />
PAGE 7 OF 49<br />
b. Surface preparation prior to painting shall be followed as per Table 8.0 to 16.0 of<br />
this standard shall be followed.<br />
c. Mixing and thinning.<br />
d. Application of paints and recommended limit on time intervals in between coats.<br />
4.0 EQUIPMENT<br />
4.1 All tools, brushes, rollers, spray guns, blast material, hand power tools for cleaning and all<br />
equipments, scaffolding materials, shot & grit blasting equipments & air compressors etc.<br />
required to be used shall be suitable for the work and all in good order and shall be arranged<br />
by the contractor at site and in sufficient quantity. The manufacturer’s test certificates / data<br />
sheets for all the above items shall be reviewed by Engineer-in-charge at site before start of<br />
work.<br />
4.2 Mechanical mixer shall be used for paint mixing operations in case of two pack systems<br />
except that the Engineer-In-Charge may allow the hand mixing of small quantities at his<br />
discretion in case of specific requirement for touch up work only.<br />
5.0 SURFACE PREPARATION, SHOP PRIMER COATING APPLICATION & REPAIR<br />
AND DOCUMENTATION<br />
5.1 General<br />
5.1.1 In order to achieve the maximum durability, one or more of following methods of surface<br />
preparation shall be followed, depending on condition of surface to be painted and as<br />
instructed by Engineer-In-Charge. Adhesion of the paint film to surface depends largely on<br />
the degree of cleanliness of the metal surface. Proper surface preparation contributes more to<br />
the success of the paint protective system.<br />
a. Abrasive blast cleaning<br />
b. Mechanical or power tool cleaning<br />
5.1.2 Mill scale, rust, rust scale and foreign matter shall be removed fully to ensure that a clean and<br />
dry surface is obtained. Unless otherwise specified, surface preparation shall be done as per<br />
provisions of relevant tables given elsewhere in this specification. The minimum acceptable<br />
standard, in case of thermally sprayed metal coatings, in case of mechanical or power tool<br />
cleaning it shall be St. 3 or equivalent. In case of blast cleaning it shall be Sa 2-1/2 as per<br />
Swedish Standard SIS-055900 (latest edition) or SSPC-SP or ISO 8501-01.Blast cleaning<br />
shall be Sa 3 as per Swedish Standard in case thermally sprayed metal coatings.<br />
Before surface preparation by blast cleaning, the surface shall be degreased by aromatic<br />
solvent to remove all grease, oil etc.<br />
5.1.3 Irrespective of whether external or internal surface to be coated, blast cleaning shall not be<br />
performed where dust can contaminate surfaces undergoing such cleaning or during humid<br />
weather conditions having humidity exceed 85%. In case of internal coating of storage tanks,<br />
dehumidifier shall be used, to control humidity level below 60%. Dehumidifier should<br />
depress the dew point of air in the enclosed space, sufficient enough so as to maintain it 3⁰C<br />