<strong>D2.1</strong> <strong>Requirements</strong> <strong>and</strong> <strong>Specification</strong><br />

documentation of plans, timelines <strong>and</strong> issues stored on the <strong>CORBYS</strong> file sharing system<br />

(WebDAV)<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />

8.2.1.3 Roles <strong>and</strong> responsibilities<br />

Requirement No.: SIREF11 (confer CTREF12)<br />

Name: Sub-system responsibility<br />

Description: The sub-system functionality <strong>and</strong> performance is the responsibility of the partner(s)<br />

developing the sub-system during all testing <strong>and</strong> integration stages.<br />

Reason / Comments: After the integration stage, the responsibility will have to be shared with all partners, but all<br />

partners have responsibility to offer <strong>and</strong> provide guidance, service <strong>and</strong> other assistance<br />

during the integration <strong>and</strong> evaluation stages<br />

Indicative priority M<strong>and</strong>atory<br />

8.2.1.4 Operating environment<br />

Operation environment requirements correspond 1:1 to the requirements for conformance testing: CTREF13<br />

<strong>and</strong> CTREF14<br />

Requirement No.: SIREF12 (confer CTREF13)<br />

Name: Integrated system power resources<br />

Description: The Consortium need to decide whether a battery or a mains powered system will be<br />

targeted<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />

8.2.1.5 Resources<br />

Requirement No.: SIREF13<br />

Name: Resource limitations encountered in the system integration stage<br />

Description: Resource limitations emerging in the integration stage (for example power or processing<br />

will have to be dealt with in a process involving the system integrators <strong>and</strong> the partners<br />

sharing the limited resource)<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />

8.2.2 Non Functional <strong>Requirements</strong><br />

8.2.2.1 Performance<br />

Requirement No.: SIREF12 (confer CTREF12)<br />

Name: Integrated system performance testing<br />

Description: The integrated system will be subject to performance testing. These tests will partly be to<br />

done to verify that sub-components performs as planned, <strong>and</strong> partly to verify that system<br />

features of the integrated system performs.<br />

Performance test parameters will be derived/extracted from target system specifications<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />