D2.1 Requirements and Specification - CORBYS
D2.1 Requirements and Specification - CORBYS
D2.1 Requirements and Specification - CORBYS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>D2.1</strong> <strong>Requirements</strong> <strong>and</strong> <strong>Specification</strong><br />
Description: The <strong>CORBYS</strong> gait rehabilitation system will be designed to be ambulatory, e.g., with<br />
wheels, moving around during gait rehabilitation therapy.<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
8.1.1.5 Resources<br />
Requirement No.: CTREF15<br />
Name: Sub-system conformance testing equipment<br />
Description: Special, dedicated test equipment, jigs et cetera required to perform conformance testing are<br />
supplied by the developing partner of the sub-system<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
8.1.2 Non Functional <strong>Requirements</strong><br />
8.1.2.1 Performance<br />
Requirement No.: CTREF16<br />
Name: Sub-system conformance testing of performance<br />
Description: Performance testing is not the main concern of conformance testing, but should have been<br />
carried out by developers of the sub-system prior to integration.<br />
Some limited performance testing should however be included in the conformance testing to<br />
verify functionality (such as to verify that an increase in control system load gives the<br />
expected feedback)<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
8.1.2.2 Safety <strong>and</strong> reliability<br />
Requirement No.: CTREF17<br />
Name: Sub-system evaluation of user hasards <strong>and</strong> safety<br />
Description: User safety is a prime concern for all medical devices. During conformance testing <strong>and</strong> in<br />
integration stages, hasards <strong>and</strong> safety concerns of all sub-systems shall be evaluated as part<br />
of the sub-system h<strong>and</strong>-over to integration partners. Hasards <strong>and</strong> safety aspects shall be<br />
considered for all <strong>CORBYS</strong> users - both patients <strong>and</strong> professionals.<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
Requirement No.: CTREF18<br />
Name: Sub-system evaluation of reliability<br />
Description: The developer of the sub-system is responsible for ensuring that their sub-system<br />
components operate reliably. The developer’s effort to ensure this should be discussed<br />
during conformance testing.<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
89