D2.1 Requirements and Specification - CORBYS
D2.1 Requirements and Specification - CORBYS
D2.1 Requirements and Specification - CORBYS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>D2.1</strong> <strong>Requirements</strong> <strong>and</strong> <strong>Specification</strong><br />
Indicative priority M<strong>and</strong>atory<br />
Requirement No.: CTREF7<br />
Name: Conformance testing test protocol design<br />
Description: Test plans shall have unique definition of test objects (physical components shall be<br />
uniquely marked <strong>and</strong> software shall have correct version numbering). It shall further<br />
contain information about test site, test date <strong>and</strong> test personnel<br />
The test protocol when feasible will be designed with the following information for each test<br />
item:<br />
� Unique test item number<br />
� Description of test activity<br />
� Description of expected test result (which should be in accordance with target<br />
specifications)<br />
� Check box field for entering test result with the following alternatives:<br />
Passed/Failed<br />
� Field for entering test observation (in particular observations when the “Failed” box<br />
was checked.<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
Requirement No.: CONF2<br />
Name:<br />
Mechanical <strong>and</strong> electrical design of necessary test rigs.<br />
Description: Rigs <strong>and</strong> setups to test actuators of orthosis through <strong>and</strong> mobile manipulator need<br />
mechanical design, bill of materials, electrical design <strong>and</strong> software structure.<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
Requirement No.: CONF3<br />
Name: Production of test rigs<br />
Description: Manufacturing <strong>and</strong> assembly, cabling, functional test, software design for test procedures.<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
Requirement No.: CONF4<br />
Name: Sensor verification<br />
Description: Sensor function will be verified with third party measurement techniques <strong>and</strong> third party<br />
sensors. Options for calibration <strong>and</strong> necessary maintenance intervals will be presented.<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
Output<br />
Requirement No.: CTREF8<br />
Name: Sub-system test reports from conformance testing<br />
Description: For <strong>CORBYS</strong> sub-systems, the results of conformance testing will be stored as project<br />
internal development documentation.<br />
Reason / Comments:<br />
Indicative priority M<strong>and</strong>atory<br />
Requirement No.: CONF5<br />
Name: Data sheet <strong>and</strong> measurement/test protocols<br />
Description: Conformance with requirements <strong>and</strong> specifications has been proven with a final data sheet<br />
87