11.12.2012 Views

D2.1 Requirements and Specification - CORBYS

D2.1 Requirements and Specification - CORBYS

D2.1 Requirements and Specification - CORBYS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>D2.1</strong> <strong>Requirements</strong> <strong>and</strong> <strong>Specification</strong><br />

Indicative priority M<strong>and</strong>atory<br />

Requirement No.: CTREF7<br />

Name: Conformance testing test protocol design<br />

Description: Test plans shall have unique definition of test objects (physical components shall be<br />

uniquely marked <strong>and</strong> software shall have correct version numbering). It shall further<br />

contain information about test site, test date <strong>and</strong> test personnel<br />

The test protocol when feasible will be designed with the following information for each test<br />

item:<br />

� Unique test item number<br />

� Description of test activity<br />

� Description of expected test result (which should be in accordance with target<br />

specifications)<br />

� Check box field for entering test result with the following alternatives:<br />

Passed/Failed<br />

� Field for entering test observation (in particular observations when the “Failed” box<br />

was checked.<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />

Requirement No.: CONF2<br />

Name:<br />

Mechanical <strong>and</strong> electrical design of necessary test rigs.<br />

Description: Rigs <strong>and</strong> setups to test actuators of orthosis through <strong>and</strong> mobile manipulator need<br />

mechanical design, bill of materials, electrical design <strong>and</strong> software structure.<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />

Requirement No.: CONF3<br />

Name: Production of test rigs<br />

Description: Manufacturing <strong>and</strong> assembly, cabling, functional test, software design for test procedures.<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />

Requirement No.: CONF4<br />

Name: Sensor verification<br />

Description: Sensor function will be verified with third party measurement techniques <strong>and</strong> third party<br />

sensors. Options for calibration <strong>and</strong> necessary maintenance intervals will be presented.<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />

Output<br />

Requirement No.: CTREF8<br />

Name: Sub-system test reports from conformance testing<br />

Description: For <strong>CORBYS</strong> sub-systems, the results of conformance testing will be stored as project<br />

internal development documentation.<br />

Reason / Comments:<br />

Indicative priority M<strong>and</strong>atory<br />

Requirement No.: CONF5<br />

Name: Data sheet <strong>and</strong> measurement/test protocols<br />

Description: Conformance with requirements <strong>and</strong> specifications has been proven with a final data sheet<br />

87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!