2. Sharepoint tool as a central solution regarding to requirements in Project Initiation<br />

Document with to up 1 month time availability on conditions:<br />

- Define monthly cost of application in Sharepoint – 25 € for 500 MB;<br />

- Define capacity of registering documents in database due to 1 year(including imported<br />

documents);<br />

- Define deadline and condition of imports old documents to new solution<br />

- Define the lifecycle application<br />

Afterwards, a new solution was proposed by Project Manager:<br />

2.4 Action type<br />

Change the solution into Sharepoint or remain with eCM<br />

2.5 Effect of each option<br />

Deadline exceeding:<br />

- More than 3 month – choosing eCM tool as a solution<br />

- Up to 1 month – choosing Sharepoint<br />

Risk mitigation in the case Sharepoint is chosen and the time of its supply exceeds<br />

1 month – according to the Project Plan<br />

2.6 Recommendation<br />

It is recommended to use Sharepoint solution which will speed up the process of<br />

registering the agreements in Philips Poland according to the assumptions of the<br />

Business Case.<br />

The client has decided to undertake the recommended local solution even<br />

though the Central guidelines prohibit the creation of local applications. In this<br />

example, the use of prevention in order to avoid waiting for the decision on the<br />

access to the use of the applications and on the participation in the costs for about<br />

3-6 months. The local solution – creating the application “Register of Contracts” in<br />

the Microsoft SharePoint technology has also helped in observing the project deadline.<br />

Therefore, the new Project Plan was signed with new terms and with a<br />

tolerance of 2 weeks:<br />

1. Plan description<br />