INFORMATION SYSTEMS IN MANAGEMENT V - SGGW
INFORMATION SYSTEMS IN MANAGEMENT V - SGGW
INFORMATION SYSTEMS IN MANAGEMENT V - SGGW
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(40% * 7 + 10% * 8 + 10% * 9 + 100% * 5 + 100% * 5 + 100 + 6% * 100% * 100<br />
+ 6% * 2 + 100% * 4 + 10% * 6 + 10% * 8 + 10% * 7 + 100% * 7 + 100% * 10 +<br />
100% * 7 + 10% * 7 + 100% * 8) / 112 = 60%<br />
The average probability of success.<br />
3. Sample calculations for a third of the group:<br />
Enterprise: the size of a small production company - working on the commercial<br />
market.<br />
The results of the analysis criteria and calculations:<br />
(10% * 7 + 10% * 8 + 10 + 9% * 10% * 5 + 40% * 5 + 100 + 6% * 100% * 100 +<br />
6% * 2 + 10% * 4 + 10% * 6 + 10% * 8 + 10% * 7 + 100% * 7 + 10 + 10% * 10%<br />
* 7 + 10% * 7 + 10% * 8) / 112 = 28%<br />
Fairly low probability of success.<br />
On the basis of these and similar calculations the following ranges were set:<br />
• 0 - 20% - unfavorable conditions for the implementation of e-learning (most<br />
likely a very small usefulness)<br />
• 20% - 50% - quite favorable conditions for implementation of e-learning (possible<br />
introduction of e-learning in a limited way - to meet the very specific needs of<br />
the company)<br />
• 50% - 80% - favorable conditions for implementation of e-learning (a fairly high<br />
probability of success of implementation, however, must be preceded by careful<br />
analysis)<br />
• 80% - 100% - very favorable conditions for implementation of e-learning (the<br />
company is prepared technically, mentally and organizationally for the introduction<br />
of this technology)<br />
5. CONCLUSION<br />
Please note that the proposed model is quite general and simplified. It can be<br />
used to develop a much more detailed and accurate analysis tool for each company.<br />
However, the primary goal of this analysis is to make the initial diagnosis -if we<br />
look forward or reject the undertaking as it might be too risky. Important part of<br />
collected material is emerged picture of company ready to implement an e-learning<br />
and a set of its certain features. A new tool has been developed which allows<br />
analysis of individual cases and also know an environment in the whole industries.<br />
93