INFORMATION SYSTEMS IN MANAGEMENT V - SGGW
INFORMATION SYSTEMS IN MANAGEMENT V - SGGW
INFORMATION SYSTEMS IN MANAGEMENT V - SGGW
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
the enterprise level: knowledge is a basic tools for lower the risk and every decision<br />
should be analyze from the enterprise and the organization point of<br />
view.<br />
These six postulates are crucial ones. They do not replace the rules of different<br />
kind risk management but they establish the common environment for creation of<br />
the integrated risk management system.<br />
5. CONCLUSIONS<br />
Presented concept is based on goal-driven approach. The success of the<br />
IT enterprises is the result of activities of every involved person. For the efficient<br />
use of their engagement they must be aware of all the circum-stances and they<br />
activity have to be organized and compatible. Creation of the integrated risk<br />
management system cannot be done for a single enter-prise but it needs the<br />
consequent action on the level of entire organization. Above all, activities associated<br />
with the risk and its management must be-come the element of the<br />
organizational culture.<br />
REFERENCES<br />
1. Alberts C.J. (2006) Common Elements of Risk, Technical Report CMU/SEI-2006-TN-<br />
014, Carnegie Mellon University, Pittsburgh,<br />
2. Dudycz H., Dyczkowski M. (2007) Efektywność przedsięwzięć informatycznych.<br />
Wydawnictwo Akademii Ekonomicznej we Wrocławiu<br />
3. Dymek D. (1999) Wybrane metody szacowania zasobów w inżynierii oprogramowania,<br />
Zeszyty Naukowe nr 522, Akademia Ekonomiczna w Krakowie<br />
4. Dymek D. (2008a) The Institutional Aspect Of The Responsibility Distribution In The<br />
IT Enterprise, Proceedings of the IASTED International Conference on Internet and<br />
Multimedia Systems and Application, Acta Press, Innsbruck, pp. 100-104<br />
5. Dymek D. (2008b) Nieciągłość nadzoru w przedsięwzięciach informatycznych jako<br />
czynnik ryzyka, Zeszyty Naukowe Wyższej Szkoły Ekonomiczno-Społecznej w Ostrołęce,<br />
Ostrołęka, str. 55-60<br />
6. ISO (2001) ISO/EIC 9126: Software engineering – Software product quality, International<br />
Organization for Standardization<br />
7. Kaczmarek T.T. (2008) Ryzyko i zarządzanie ryzykiem, Difin<br />
8. Karzner H. (2004) Advanced Project Management, John Wiley & Sons Inc.<br />
9. Kuraś M., Zając A. (1999) Czynniki powodzenia i ryzyka projektów informatycznych,<br />
Zeszyty Naukowe nr 522, Akademia Ekonomiczna w Krakowie<br />
10. Pańkowska M. (2001) Zarządzanie zasobami informatycznymi, Difin,<br />
24