10.02.2013 Views

Defensor Mk5 Technical Documentation

Defensor Mk5 Technical Documentation

Defensor Mk5 Technical Documentation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.4.2 Accessory details<br />

Steam distribution pipes 81-... for indirect room humidification<br />

The steam distribution pipes are selected on the basis of the duct width (for horizontal installation) or<br />

the duct height (for vertical installation) and the capacity of the steam humidifier.<br />

Important! Always select the longest possible steam distribution pipe (optimum humidification distance).<br />

L<br />

B<br />

Steam distribution pipes 81-...<br />

for <strong>Defensor</strong> <strong>Mk5</strong> (CrNi steel)<br />

Duct width (B) Steam output<br />

Type Length in mm (L) 3) in mm max. in kg/h<br />

81-200 1) 200 210…400 10<br />

81-350 2) 350 400…600 30<br />

81-500 2) 500 600…750 30<br />

81-650 650 750…900 50<br />

81-800 800 900…1100 50<br />

81-1000 1000 1100…1300 50<br />

81-1200 1200 1300…1600 50<br />

81-1500 1500 1600…2000 50<br />

81-1800 1800 2000…2400 50<br />

81-2000 2000 2200…2600 50<br />

81-2300 2300 2500…2900 50<br />

81-2500 2500 2700…3100 50<br />

1) Only for units with a max. steam capacity of 10 kg/h<br />

2) Only for units with a max. steam capacity of 30 kg/h<br />

3) Special length available on request<br />

Note: If the humidification distance (see chapter 5.3.1) has to be reduced for technical reasons, the<br />

amount of steam per basic unit must be divided between two steam distribution pipes or the OptiSorp<br />

steam distribution system must be used. If this is the case, contact your <strong>Defensor</strong> supplier.<br />

Steam distribution pipe “Process” (accessory “Z...”)<br />

The steam distribution pipe “Process” is used for direct humidification of material in manufacturing<br />

processes (process humidification), or in ventilation ducts with a critical saturation distance (the<br />

steam distribution pipe “Process” reduces the saturation distance by approximately 30%). The desired<br />

length must be specified when ordering.<br />

Please contact your <strong>Defensor</strong> distributor, they will assist you in customizing the steam distribution head<br />

“Process”. Please have the following information readily available:<br />

– steam quantity in kg/h<br />

– dimensions of ventilation duct (width x height)<br />

Important! The table for the determination of the humidification distance provided in chapter 5.3.1 does<br />

not apply to the Process steam distribution pipe.<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!