Defensor Mk5 Technical Documentation
Defensor Mk5 Technical Documentation
Defensor Mk5 Technical Documentation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5.4.2 Inspecting the water installation<br />
32<br />
Use the following check list to ascertain that the installation has been performed correctly:<br />
– Water supply<br />
Has filter valve or shut-off valve and filter 5 µm respectively been installed in supply line?<br />
Have admissible water pressure (1.0 – 10 bar) and temperature (1 – 40 °C) been observed?<br />
Does supply capacity match the humidifier(s)?<br />
Are all pipes properly secured (threaded connections tightened)?<br />
Is the feed pipe properly sealed?<br />
– Water drain<br />
Has minimum inside diameter of drain pipes been maintained at least 40 mm throughout the<br />
entire length?<br />
Has drain pipe been installed with a downslope of at least 10 %?<br />
Has the heat resistance of the material used been verified to be at least 100°C?<br />
Are hoses and lines properly secured (hose clamps and threaded connections tightened)?