01.05.2013 Views

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

accuses various management tiers of complacency that, with a few exceptions,<br />

varied only in degree, they cannot be exclusively blamed.<br />

51. Whether that was due to professional inadequacies, lack of awareness or<br />

commitment, no cogent explanation or material was produced on the subject.<br />

That was also valid with respect to various other institutional parameters and<br />

frameworks for developing / reviewing guidelines contemplated by the following<br />

extant laws, The Canal and Drainage Act 1873 as adopted by the Provinces,<br />

Minors Canals Act 1935, Punjab Soil Reclamation Act 1952, Balochistan<br />

Irrigation Ordinance 1980, Punjab Water User Associations Ordinance<br />

1981, IRSA Act 1992, four Provincial Irrigation and Drainage Authority Acts<br />

of 1997 and Environment Protection Acts of 1997. At least, these were not<br />

shared with the Commission except KP, despite specific reference. The NDMA<br />

is not only legally under obligation to oversee pre-disaster phase preparations; it<br />

has yet to carve its niche for a systematic overview of the entire flood matrix to<br />

chalk out a disaster specific action plan, following the wisdom that ‘those who<br />

sweat more during peace bleed less during war’. The Commission noted with<br />

satisfaction that the NDMA has taken in hand formulation of a National Plan with<br />

JICA’s technical assistance.<br />

52. The position in <strong>PDMA</strong>s and DDMAs was slightly different; while these<br />

bodies had sketched general outlines of their skeleton plans, with clearly<br />

demarcated roles and division of responsibilities for respective field outfits,<br />

including Civil Defence, their professional reviews and revisiting would enhance<br />

utility, and make these more meaningful and comprehensive management tools,<br />

worthy of responding to disasters situations including flood, road accidents,<br />

accidental fires, collapse of dilapidated buildings in urban areas or earthquakes<br />

or even a nuclear accident, etc God forbid. The deficiencies observed during<br />

2010 flood offer a rich experience to realign the District Plans in the light of<br />

Provincial guidelines, under the national level umbrella of the NDMA framework.<br />

Much more is needed to be done.<br />

Page 119 of 211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!