01.05.2013 Views

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNEX-IV-B<br />

INDICATIVE FOREIGN ASSISTANCE BUT NOT FIRMED UP EXCEPT<br />

WHERE INDICATED OTHERWISE FOR POST FLOODS RECONSTRUCTION<br />

AMOUNT<br />

(US$ M)<br />

COUNTRY / PROJECTIZED<br />

REMARKS Disburse<br />

IFI<br />

ASSISTANCE<br />

d so far<br />

1 China 590<br />

Nil<br />

NHA Projects: 190<br />

Concessional Loan: 100<br />

Preferential Buyer’s<br />

Credit: 300<br />

2 USA 155 These allocations have<br />

been proposed to be<br />

readjusted from the existing<br />

portfolio of KLB for the year<br />

2010. EAD is engaged with<br />

USAID for the mechanism<br />

of utilization of these<br />

4 Italy 28.56<br />

allocations. This amount will<br />

be expected to be utilized<br />

for second tranch of Rs.<br />

40,000 to be paid to flood<br />

affected families per house<br />

hold.<br />

Confirmation from Italy is<br />

awaited<br />

5 IDB 10 For agriculture sector<br />

(seeds, earth moving<br />

machinery) and<br />

reconstruction of social<br />

services (education and<br />

health) projects<br />

6 Japan 173 For rural roads rehabilitation<br />

in KPK. The loan has been<br />

signed as of 22-02-2011at<br />

the rate of 0.01% with 40<br />

years repayment period.<br />

Released US $ 25 Million to<br />

KPK<br />

7 Saudi Arabia 300 It is a soft loan facility and<br />

Planning & Development<br />

Division has been<br />

Nil<br />

Nil<br />

Nil<br />

25<br />

Nil<br />

Page 209 of 211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!