minimal works at Tori after approval in principle of a scheme worth Rs.82 millions<br />

on 4 th February 2010. The departmental contention that the Tori rehabilitation<br />

scheme was not approved by the competent forum or Federal funds were not<br />

provided was a crude attempt to cover up gross negligence after failure to<br />

suppress that evidence; being an after thought, that alibi did not deserve any<br />

credence, whatsoever.<br />

60. Be that as it may, in the case of Sindh, the most important issues were<br />

breach of Tori Bund in Guddu Barrage area and two other bunds built back-to-<br />

back, namely secondary bunds of old Ghauspur and Gaurghat that together form<br />

a triangular, virtually a semi-circular loop that had breached, with cascading<br />

effect within 30 minutes of the breach of the main bund, and MS Bund and PB<br />

Bunds near Thatta, all exacerbated by incompatible use of the lands nearby for<br />

agriculture, fish farm and cattle use. The consistent positions taken by the<br />

Irrigation officials, including the Provincial irrigation Minister that the main Tori<br />

Bund, as also MS bund and PB bunds in Thatta-Sujawal, breached by<br />

overtopping by exceptionally unprecedented flood levels for extended durations,<br />

was contradicted both by public complaints that viewed Tori Bund breach as<br />

deliberate, as also pre-flood and post-flood proceedings of the IRC, amongst<br />

others about which the Hon’ble Minister may not have been briefed at the<br />

relevant time in 2010. The position was inherently unsustainable, nay grossly<br />

misleading attempt, inter-alia, on following counts:-<br />

a. Firstly, the record of self-evident proceedings [Items no 2.a, of the<br />

IRC meeting of 4 th February 2010 for Tori Rs.81.572 million<br />

[Appendix-K] wherein approval was sought for certain works on<br />

river side of the bund and other necessary repair to strengthen and<br />

armour the Tori Bund, some six months before the floods. This<br />

contains graphic details about the deteriorated condition of the<br />

Bund; that status had been assessed after 2009 nominal floods and<br />

the then Secretary Irrigation, Mr. Junejo who was Vice Chairman of<br />

the IRC was fully aware and foretold that delay in repairs before the<br />