Khawaja Zaheer Ahmed - PDMA
Khawaja Zaheer Ahmed - PDMA
Khawaja Zaheer Ahmed - PDMA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
informed that post-completion evaluation of the flood sector PSDP<br />
schemes was also the responsibility of the Commission, a role that<br />
was not flagged by the FFC itself before this Commission. With<br />
respect to the claims of unprecedented flood it reported to the<br />
Supreme Court that super-flood flows in Sindh were below 1976, to<br />
dispel the assertions that high flood overtopped the bunds<br />
constructed with 6 feet freeboard above the 1976 HFL. But being<br />
the lead inter-provincial forum, the FFC had to render a more pro-<br />
active role in overseeing optimal use of allocated resources,<br />
beyond its projected limited role claimed before the Commission.<br />
In-house staff constraints could be supplemented by other<br />
innovative resource persons. It was noted that the FFC had not<br />
been able to optimise its role beyond associating itself with the<br />
foreign funded project assistance or even utilize modest funds<br />
allocated for post-evaluation of projects. It also did not take any<br />
initiative to seek annual ritualistic activation of ‘Flood Overview<br />
Committee’ for the 2010 Floods season. It was disappointing to<br />
note that the Universities of Engineering & Technology did not<br />
respond to its communication regarding academic studies on 2010<br />
flood though some of their senior academia appeared before the<br />
Punjab Judicial Commission. This Commission expects the FFC to<br />
revisit its mandate in close coordination with NDMA.<br />
b) Indus River System Authority (IRSA) created under a 1992 Act of<br />
Parliament to regulate and oversee normal irrigation supplies as<br />
custodian of the 1991 Inter-Provincial distribution accord. All<br />
releases from various dams and reservoirs require its indents. Its<br />
role to the extent of purposes directly relevant for the Commission’s<br />
mandate came under review in WAPDA’s presentation as well. The<br />
Commission confirmed inadequate water supplies for Kharif crop<br />
2010-11 in Kirther canal though overall water supply for<br />
Balochistan, through pat-feeder system, had been enhanced by<br />
Page 125 of 211