einforces the public view that it did not overtop in 2010,<br />
but contradicted the after thought of CE Guddu that it<br />
had not been attended since 1976.<br />
xiii) Appendix II specifies formulae based measurement of the<br />
speed of water arrival, time lag from various locations, flood<br />
prediction techniques. Para 4 in this part deals with flood<br />
warning regarding flood peaks, to assess the downstream<br />
discharges to be communicated to Provincial Irrigation<br />
Secretary. The anticipated discharge for downstream Guddu<br />
is estimated at 600 000-1,200,000 cusecs in the Manual, the<br />
ceilings for downstream Sukkur and Kotri are reduced by<br />
100,000 cusec each, at 600,000-1,100,000 cusecs, and<br />
400,000-1,000,000 cusecs, respectively. The Manual<br />
specifies that as soon as the discharges at the three<br />
barrages cross the minimum threshold levels, the Secretary<br />
Irrigation shall be informed for further directions. In our<br />
view, this part of the Manual, read with chapter XIII<br />
obligations, was most crucial at critical stages of<br />
decision making during the 2010 Flood.<br />
xiv) Appendix IV provides history of breaches in two major<br />
bunds subject matter of inquiry, Tori Bund breached for 19<br />
times during 1904 up to 1996 and their causes: 16 cuts in<br />
MS Bunder Bund during 1919-1988 and 5 cuts in Aliwahan<br />
(1976).The breaches after independence are well<br />
documented. It also shows the bunds that received<br />
prioritized attention and funds.<br />
xv) Appendix V of the Manual deals with miscellaneous but<br />
specific river works relevant for Sindh Province, including:<br />
Feasibility of Flood control measures; Revetments, Cement<br />
stabilized soil revetments and Use of tree groynes. And<br />