average length of 200 ft; it was suspected that had this not<br />

happened, 193, 000 acre feet of water would have inundated<br />

Ghotki district.<br />

pp) Within Sindh, its declining but sustained flows demolished nearby<br />

secondary Loop Bunds of old Ghauspur, Ghaurghat Bund and B.S.<br />

Feeder Canal Bunds too, to dislocate large populations besides<br />

inundation of the fertile farm-lands.<br />

qq) These bunds had a history of frequent breaches, recorded in the<br />

Sindh Bund Manual but not always necessarily coinciding with<br />

Super floods: e.g. Tori Bund breached in 1904, 1930, 1932, 1942,<br />

1975, 1976 and 1995; old Ghauspur Loop Bund in 1912, 1921,<br />

1924, 1925, 1926, 1927, 1928, and 1929; whereas the GG Bund<br />

breached in 1929, 1935, 1955, 1956 and 1976.<br />

rr) By 10 th August, 1,131,000 cusecs reached Sukkur Barrage with<br />

reduced capacity of 1.1 million cusecs. This barrage was<br />

constructed in 1932 with a designed capacity of 1,500, 000 cusecs<br />

optimum, and at a time when up-country major water reservoirs<br />

under the 1960 Indus Water Treaty were not even in contemplation.<br />

It commands some 7.0 million acres of fertile farm lands including<br />

date-palm orchards in Khairpur through seven canals, three on right<br />

bank and four on left bank with scores of minors and subsidiary<br />

channels and is thus an important source of livelihood.<br />

ss) Further downstream Sukkur Barrage, within Sindh, it took 17 days<br />

for the super floods to reach 1956 vintage Kotri Barrage with<br />

optimum design discharge of 1.0 million cusecs. In 2000, its gates<br />

were revamped and pond level was raised by 2 feet.<br />

tt) On 27 th August, 964, 897 cusecs passed Kotri against previous<br />

highest of 981,000 in 1956.<br />

uu) Against expected travel time of 72-78 hours from Sukkar to Kotri, it<br />

took 336 extra hours.<br />