01.05.2013 Views

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the LGB/LMB to flood Mianwali and Bhakkar districts. The flood<br />

that peaked at Taunsa on 2 nd August had also breached the 7,410<br />

ft long LMB and many more secondary bunds and canals damaged<br />

by massive flows that escaped therefrom, due to multiple factors<br />

including inattention to the complaint of jamming of electronically<br />

operated gates since 17July. It was pointed out that spur 5 was<br />

saved but the LMB’s breach at RD 32-33 led to extensive damages<br />

in Muzaffargarh district where TP link and Thal canal overflowed to<br />

inundate Kot Addu for weeks. Heavy discharges from torrential rain<br />

in Suleiman range raised the flood waters downstream DG Khan,<br />

Rajanpur and RY Khan to 1.2 million cusecs, breaching Jampur<br />

and Mithan Kot Bunds that inundated many towns; the flood was<br />

described as 1/1000 years. The incomplete Bhong Bund that<br />

breached upstream Guddu on the Punjab-Sindh boundary<br />

inundated vast areas in the Punjab as well. It was disclosed that<br />

breaching sections are specified for Jinnah barrage (RMB: RD<br />

6700-8700 and LMB: RD 5000) and Dholewala Groyne inside the<br />

river which were activated after due consultations by the civil-<br />

military officials, on spot, as soon as the gauge touched the critical<br />

high of RL 700 and rising, following Khairabad downstream<br />

discharge at Tarbela of 1.1 million cusecs. The water that escaped<br />

from these pre-designated breaches re-entered downstream Jinnah<br />

Barrage, as expected. While denying any motivated, parochial<br />

expedient or considerations, it was conceded that at many places<br />

people prevented or even induced human interventions to cause<br />

breaches in defiance of official persuasions, urgings, warnings and<br />

directions; managerial weaknesses and human errors where noted<br />

were subjected to E and D proceedings, since put on hold in view<br />

of the on-going inquiry by the Punjab Judicial Commission. It was<br />

also admitted that but for timely presence of army personnel,<br />

damages at certain places could not have been contained by local<br />

Page 55 of 211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!