67. The adumbration of the above evidence, the information and the<br />

Commission’s field visits when related to the relevant official instructions and<br />

observed practices established that:-<br />

a. The NDMA’s lead role in coordination of rescue and relief phases<br />

during and after the floods to save life, if not the property, was<br />

outstanding, by any standard. But it did not put in position pre-<br />

disaster structural framework or administrative network mandated<br />

in 2006 or contemplated by the NDMA Ordinance 2007 (LIII of<br />

2007) or 2009 Ordinance, despite passage of over 42 months till<br />

June 2010 or later to-date.<br />

b. The PMD’s rain forecasts were timely but its estimations regarding<br />

flood discharges were not as accurate as it was generally<br />

perceived; the FFD needed to factor in the flows from hill torrents<br />

and along other rivers where no gauges are installed; the need to<br />

boost its capacity to forecast beyond 4-days advance warning as<br />

compared to 10-days international best was also established;<br />

during flood season 2010, its 28 th June assessment was off the<br />

mark within 3-weeks. More than that, scientific simulations and<br />

weather modelling approach by highly qualified mathematical<br />

models could also generate better outcomes. The PMD should not<br />

have ignored international assessments except at a great peril,<br />

even if these did not conform to its wildest estimations, knowing in-<br />

house technical capacity constraints.<br />

c. The KP did not have the occasion or adequate time to plan or act<br />

against flash floods, but in terms of response time and actions, it<br />

acted fast to restore the damaged irrigation supplies through make-<br />

shift arrangements that enabled most farmers to plant a bumper<br />