01.05.2013 Views

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ags of fertilizers were handed over to 210,483 farmers, to<br />

invigorate Rabi crops sowing over 1.1 million acres of<br />

farmlands under favourable weather conditions and another<br />

18,7621 bags were under distribution. Details of relief goods,<br />

equipment and other essential supplies provided through<br />

civil outfits and armed forces were given: 850 Boats, 892<br />

Out-board Engines, 105 dewatering sets and 10,656 Life<br />

Jackets, 61,321 Tents including those provided by the<br />

NDMA (12,398), ERC (13,723), UAE and Saudi Kingdom<br />

(6,000), in addition to 28, 800 arranged by the <strong>PDMA</strong> for 11<br />

most directly affected districts. Other in-kind donations,<br />

secured from private/ party sources included 143,359 dry<br />

rations and 2,275 truck loads of essential supplies that<br />

included 479 trucks containing winter needs: 254,206 Quilts,<br />

136,392 Blankets, 22,584 Jackets/ Sweaters and 16,949<br />

Bed sheets besides 60,897 miscellaneous articles collected<br />

and distributed. Of these 350 truck-loads, mostly donated,<br />

had been sent out to KP, Sindh, AJK and Gilgit–Baltistan, as<br />

a good-will gesture, at times on appeals from local<br />

authorities/people of rain affected hilly-areas. In addition to<br />

in-kind official and non-official support mobilized by the<br />

Provincial Government, Rs. 434 million were provided to the<br />

DCOs concerned for disbursements to those in need of<br />

essential items. 89 Model villages were being constructed<br />

with the help of 30 donors, local NGOs, bilateral grants,<br />

international organisations as provincial resources were<br />

committed for provision of allied facilities at a cost of Rs. 242<br />

million; PRSP was the largest NGO assigned to construct<br />

2,191 houses in 20 villages at a cost of Rs. 1,167 million;<br />

three Japanese NGOs undertook to build 2,110 houses and<br />

over 212 acres of land was earmarked; additional land<br />

Page 65 of 211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!