Khawaja Zaheer Ahmed - PDMA
Khawaja Zaheer Ahmed - PDMA
Khawaja Zaheer Ahmed - PDMA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
iv) Ms. Iffat Malik Acting D.G. <strong>PDMA</strong> Sindh deposed with<br />
respect to her organization and work to state that three<br />
agencies were responsible for relief and rehabilitation in<br />
Sindh: The Relief Commissioner, Secretary Rehabilitation<br />
and the <strong>PDMA</strong>. A brief overview of the <strong>PDMA</strong>’s work and<br />
performance during 2010 flood disaster was provided to<br />
confirm that flood water in certain areas was still waiting to<br />
be drained. These were later supplemented with a written<br />
response dated 3 rd March 2011 extensively documented as<br />
–a- consolidated position of the Sindh Government on the 13<br />
formulations, including the coordination with armed forces<br />
and international donors. From preparation of district plans,<br />
to inspection and review of the ground conditions, issuance<br />
of alerts or services rendered by various levels, beginning<br />
April/ May 2010, in focussed sessions held on 17 th , 19 th , 24 th<br />
and 26th May and 23 rd June in batches of most vulnerable<br />
districts, before participating in the NDMA Conference of 28 th<br />
June 2010 have been listed in detail. These measures<br />
expected an integrated approach for surveys of vulnerable<br />
points to identify gaps to be plugged in time, district<br />
contingency plans for storage of essential requirements at<br />
key locations, constant vigilance of historically most<br />
threatened bunds at various stages of approaching monsoon<br />
build up, setting up of relief camps with essential<br />
prerequisites, plans for orderly shifting of most vulnerable<br />
settlements etc all designed for an organised service<br />
delivery. The <strong>PDMA</strong> arranged boats, equipment and<br />
materials requested by armed forces. The follow up actions<br />
were pursued to receive unqualified assurances from all<br />
concerned including the Irrigation Department responsible<br />
for safe upkeep of the 147 pre-identified vulnerable bunds,<br />
Page 67 of 211