01.05.2013 Views

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

Khawaja Zaheer Ahmed - PDMA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

R R R<br />

KALAT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 3<br />

QUETTA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TR 0 0 0 0 0 TR 1 TR TR 0 T<br />

SUKKUR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TR 0 T T<br />

R R<br />

R<br />

0 0 0 0 0 1<br />

8 11 9 0 2 7 0 0 0 0 0 0 37<br />

SAMUNGLI 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TR 0 0 0 0 0 TR T TR TR 0 1 0 0 0 0 0 1<br />

Source: PMD, Ministry of Defence<br />

34. In KP Province, flash floods washed away the head-works, bridges and<br />

roads besides silting of major and minor canals and farms around the rivers,<br />

including civil canals and inundation of vast human settlements; no allegations<br />

were levelled against the officials or politicians who indeed reacted promptly to<br />

restore irrigation network for 2010-11 Rabi crop that limited the losses to Kharif<br />

crops, destroyed by rivers. In Sindh, as many as 2,155 breaches were reported<br />

with canals and minors leading the list of its five irrigation regions including SIDA.<br />

Of these, 134 breaches were to the major and secondary bunds with Tori breach<br />

as the source that topped the damages. In the Punjab, except one induced<br />

breach to RGB, upstream Jinnah Barrage, rest were differently attributed by<br />

concerned officials to unprecedented high volumes and extremely lengthy<br />

durations of the super floods, though serious observations were raised by<br />

professionals about the lack of effective command at site and staff negligence.<br />

The evidence produced before the Punjab Judicial Commission flagged non-<br />

opening of barrage gates in good time, forging of official entries of gate opening<br />

at Jinnah Barrage, use of non-conforming sandy clay beneath the stone pitched<br />

LMB, natural erosion, non-maintenance, dysfunctional electronic gates awaiting<br />

repair since mid July, design issues regarding the bund slope on canal side,<br />

construction of additional weirs during 2004-07 at Taunsa Barrage under the<br />

World Bank project, all combined to create the observed havoc. The fact that the<br />

Taunsa’s LMB had been subjected to extensive repairs in 2008-2009 with design<br />

modification raised more basic questions, inter-alia, in view of the false sense of<br />

security amongst the unsuspecting residents in the vicinity. Be that as it may, the<br />

R<br />

Page 92 of 211