05.06.2013 Views

Program Policy Manual - VOLUME V - Mine Safety and Health ...

Program Policy Manual - VOLUME V - Mine Safety and Health ...

Program Policy Manual - VOLUME V - Mine Safety and Health ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MSHA PROGRAM POLICY MANUAL <strong>VOLUME</strong> V<br />

<strong>and</strong> Certification Center, Technical Support. Manufacturers of<br />

fire hose accepted by MSHA for flame resistance are required to<br />

place the acceptance numbers at intervals not to exceed 3 feet<br />

along the length of the fire hose.<br />

Where waterlines are installed on a section, sufficient fire hose<br />

shall be provided to reach from the water outlet to each working<br />

face for fire-control operations. Water hose, ordinarily<br />

provided in a section <strong>and</strong> connected to machines for dustsuppression<br />

purposes shall be considered inadequate as fire hose<br />

if the rate of water flow through the hose <strong>and</strong> nozzle is less<br />

than the required 50 gallons per minute.<br />

Average daily production figures shall be obtained from<br />

information submitted in accordance with procedures, as required<br />

by the respirable dust information reporting system.<br />

Rock dust shall be dry <strong>and</strong> usable to comply with this section.<br />

If containers other than bags are used, a means of transporting<br />

the rock dust, such as shovels, pails, etc., to any location on<br />

the section shall be provided.<br />

75.1100-2 Quantity <strong>and</strong> Location of Firefighting Equipment<br />

Paragraph (a)(1) requires that each working section in the coal<br />

mine, where the production is 300 tons per shift or more, shall<br />

be provided with one of the combinations of firefighting<br />

equipment listed below:<br />

Fire Suppresion Equipment<br />

Portable fire extinguisher<br />

240 pounds of rock dust<br />

Waterline with fire hose<br />

Portable water car<br />

Portable chemical car<br />

Portable foam-generating machine<br />

Portable high-pressure rockdusting<br />

machine<br />

February 2003 (Release V-33) 93<br />

Combination Options <strong>and</strong><br />

Number Required<br />

a b c d e f g<br />

2 2 2 2 2 2 2<br />

1 1 1 1 1 1 1<br />

1<br />

2<br />

1 1<br />

1<br />

1<br />

1 1<br />

1<br />

1<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!