05.06.2013 Views

Program Policy Manual - VOLUME V - Mine Safety and Health ...

Program Policy Manual - VOLUME V - Mine Safety and Health ...

Program Policy Manual - VOLUME V - Mine Safety and Health ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MSHA PROGRAM POLICY MANUAL <strong>VOLUME</strong> V<br />

If the mine is to be temporarily closed, the operator shall<br />

notify the District Manager promptly after ventilation is<br />

discontinued <strong>and</strong> submit a completion map no later than the<br />

expiration of the 90-day period during which the mine was not<br />

ventilated.<br />

October 2003 (Release V-34) 121

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!