25.06.2013 Views

2.0 Mb DTI/PRI Administration and Maintenance Guide Book ... - Home

2.0 Mb DTI/PRI Administration and Maintenance Guide Book ... - Home

2.0 Mb DTI/PRI Administration and Maintenance Guide Book ... - Home

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 840 of 1536 Chapter 3 — DPNSS1/DASS2 features description <strong>and</strong> implementation<br />

DASS2/DPNSS1 Packaging Notes<br />

— A Meridian 1 with routes using Level 3 DPNSS1 signaling requires the<br />

IDA <strong>and</strong> DPNSS1 packages.<br />

— A Meridian 1 with routes using Level 3 DASS2 signaling requires the<br />

IDA <strong>and</strong> DASS2 packages.<br />

— In a network which uses DPNSS1 <strong>and</strong> DASS2, the DASS2 package is<br />

required only at those Meridian 1s which are serving as DASS2<br />

gateways.<br />

— A semi-permanent connection across the ISDN requires the DPNSS1<br />

package rather than the DASS2 package.<br />

— Interworking of Network Ring Again across DPNSS1 <strong>and</strong> Q.931<br />

requires the NRAG package.<br />

553-3011-315 St<strong>and</strong>ard 10.0 May 1999

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!