02.08.2013 Views

ECL Comfort 210/310, A217/A317 Installation Guide - Danfoss ...

ECL Comfort 210/310, A217/A317 Installation Guide - Danfoss ...

ECL Comfort 210/310, A217/A317 Installation Guide - Danfoss ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Installation</strong> <strong>Guide</strong> <strong>ECL</strong> <strong>Comfort</strong> <strong>210</strong> / <strong>310</strong>, application <strong>A217</strong> / <strong>A317</strong><br />

5.5 Application<br />

Circ. P priority - <strong>A217</strong>.1 / <strong>A217</strong>.2 / <strong>A317</strong>.1 / <strong>A317</strong>.2 11055<br />

Circuit Setting range Factory setting<br />

1 OFF / ON OFF<br />

Choose whether the DHW circulation pump should be ON during DHW<br />

heating.<br />

OFF: The DHW circulation pump is switched OFF during DHW<br />

heating.<br />

ON: The DHW circulation pump is not switched OFF during<br />

DHW heating.<br />

Cont. T control - <strong>A217</strong>.1 / <strong>A217</strong>.2 / <strong>A317</strong>.1 / <strong>A317</strong>.2 11054<br />

Circuit Setting range Factory setting<br />

1 OFF / ON OFF<br />

Depending on the DHW circulation pipe connection, the desired DHW<br />

heating / charging temperature can be lowered when the DHW heating<br />

procedure has elapsed.<br />

OFF: The desired temperature at S3 or S4 is lowered to 10 °C.<br />

Typically, the DHW is circulated through the DHW tank.<br />

ON: The desired temperature at S3 or S4 is lowered to<br />

the desired DHW temperature. Typically, the DHW<br />

is circulated through the heat exchanger in order to<br />

compensate for the heat loss in the DHW circulation<br />

pipe.<br />

DHW P post-run - <strong>A217</strong>.1 / <strong>A317</strong>.1 11041<br />

Circuit Setting range Factory setting<br />

1 0 ... 30 m 0 m<br />

Set the DHW heating / charging pump (P1) post-run time (minutes). The<br />

pump can continue to be switched ON after the DHW heating procedure in<br />

order to utilize the remaining heat in the heat exchanger / boiler.<br />

0 ... 30: Set the number of minutes for the post-run.<br />

DHW P post-run - <strong>A217</strong>.2 / <strong>A317</strong>.2 11041<br />

Circuit Setting range Factory setting<br />

1 0 ... 30 m 0 m<br />

Set the DHW heating pump (P1) post-run time (minutes). The DHW heating<br />

pump can continue to be switched ON after the DHW heating procedure in<br />

order to utilize the remaining heat in the heat exchanger / boiler.<br />

0 ... 30: Set the number of minutes for the post-run.<br />

When the 'Circ. P priority' is set to OFF, the schedule for the DHW<br />

circulation pump is overruled.<br />

86 DEN-SMT/DK VI.LG.U2.02 <strong>Danfoss</strong> District Energy

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!