13.08.2013 Views

Technology Status Report: In Situ Flushing - CLU-IN

Technology Status Report: In Situ Flushing - CLU-IN

Technology Status Report: In Situ Flushing - CLU-IN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>In</strong> <strong>Situ</strong> <strong>Flushing</strong> Project Summaries<br />

GWRTAC Case Study Database<br />

GWRTAC ID: FLSH0034<br />

Project Name: Peak Oil Co./Bay Drum Co., Tampa, FL<br />

City: Tampa State/Province: FL<br />

Primary GWRTAC Personal<br />

Communication Source<br />

(Name/Organization):<br />

Project Summary:<br />

Randal Chafins<br />

U.S. EPA<br />

<strong>Report</strong>(s)/Publication(s) (GWRTAC Source):<br />

U.S. EPA, Nov. 1996: <strong>In</strong>novative Treatment Technologies: Annual <strong>Status</strong> <strong>Report</strong> (Eighth Edition),<br />

EPA 542-R-96-010, Number 8, U.S. EPA OSWER (5102G) TIO, Washington, DC<br />

The following text is from notes from April 1997 conversation with EPA RPM and <strong>In</strong>ternet URL<br />

EPA.gov:<br />

Treated site groundwater would be used as flushing solution; nutrient additives are being<br />

considered. <strong>In</strong> situ flushing project is in early design phase, and will be conducted within a slurry<br />

wall containment area. The depth of the confining layer is approximately 15 feet below the ground<br />

surface. ROD estimates five year duration for flushing project; remediation must continue until<br />

groundwater standards are achieved. Current plans are to infiltrate water through horizontal piping<br />

network.<br />

<strong>Report</strong>(s)/Publication(s) (Additional <strong>In</strong>formation Sources):<br />

U.S. EPA, Nov. 1996: <strong>In</strong>novative Treatment Technologies: Annual <strong>Status</strong> <strong>Report</strong> (Eighth Edition),<br />

EPA 542-R-96-010, Number 8, U.S. EPA OSWER (5102G) TIO, Washington, DC<br />

Ground-Water Remediation Technologies Analysis Center<br />

Operated by Concurrent Technologies Corporation<br />

Appendix - Page 70 of 164<br />

Copyright GWRTAC 1998<br />

Revision 1<br />

Tuesday, November 17, 1998

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!