ACCAM S.p.A. Incinerator Plant: Europower is responsible for providing full O&M services of an<br />

incinerator plant, which has a total capacity of 500 tons per day and steam production of 60 tons per day<br />

and electric power generator of nine MW, for ACCAM S.p.A. in Busto Arsizio, Italy. The services include<br />

plant operation, ordinary maintenance, programmed and preventive maintenance, extraordinary<br />

maintenance, spare parts supply and management, supply of chemicals, supply of expendable materials for<br />

maintenance, handling and disposal of scraps, ashes and dusts, handling and disposal of liquid effluents,<br />

management of the flue gas monitoring system, direction and coordination of the service, and assistance to<br />

the ACCAM S.p.A. for the registers, and carrying out the test trials and check-ups required by law. The<br />

duration of the contract is from 2000 to 2010. The contract value of this project is €95.00 million.<br />

ITEA, of which 77.97% is held by Sofinter and 11.99% is held by Ansaldo, specializes in areas such as boilers,<br />

EPC, flameless combustion technology and water treatment systems. In particular, ITEA has developed and patented<br />

Isotherm technology, an innovative flameless oxy-fuel pressurized combustion technology using waste and low<br />

grade coal. The new technology offers high yield waste-to-power recovery, safe treatment capabilities of highly<br />

toxic residues, environmentally friendly process and fully computerized operations control. ITEA, since 2004, has<br />

operated a five MW demonstration unit at Ansaldo Caldaie Combustion Research Centre located at Gioia del Colle.<br />

In 2008, a 15 MW Isotherm industrial unit at Jurong Island, Singapore, was completed. The plant, which is fed by<br />

petrochemical and chemical industrial waste, has also passed the operability and environmental compatibility tests,<br />

and is expected to provide steam to customers in early 2010.<br />

Some selected ongoing major projects currently undertaken by ITEA are set forth below:<br />

Project Enel: This project involves the development of an oxy-coal combustion pilot plant in 2011 for Enel<br />

S.p.A. in its Brindisi site. The plant will operate on coal water slurry and have a combustor power of 48<br />

MW. The estimated sales realization of this project is approximately €33.00 million. In addition, Enel<br />

S.p.A plans to build a 320 MW coal fired, zero emission plant by 2015, based on ITEA‘s Isotherm Pwr®<br />

technology, with the main equipment supply by ITEA.<br />

Project Arzignano: This project involves the construction of two 15 MW units for the treatment of a<br />

tannery sludge for Acque del Chiampo in Italy. This project is scheduled to be completed by 2012. The<br />

estimated sales realization of this project is approximately €55.00 to €60.00 million.<br />

Franco Tosi Meccanica<br />

With a history of more than 125 years, FTM is a permanent Westinghouse licensee for a complete range of steam<br />

turbines and has proprietary technology for a range of hydro turbines. FTM designs and manufactures steam turbines<br />

on its own and Siemens Westinghouse technology, and has the capability to design and supply electro-mechanical<br />

BOP and HP piping systems as well as in growing waste-to-energy and biomass segment. FTM has installed base of<br />

over 75,000 MW across 40 countries and over 2,000 units. FTM is headquartered in Legnano, a city near Milan, and<br />

its manufacturing facilities are located on over 350,000 sq. m. of land with a covered area of approximately 162,000<br />

sq.m..<br />

We acquired a 75.10% stake in FTM for a consideration of €40.00 million in June 2008 through our subsidiary<br />

Gammon Holdings B.V. Netherlands. FTM has an in-house production of 500,000 to 700,000 manhours per year,<br />

corresponding to approximately 10 to 12 complete steam turbine sets of 150-160 MW each aggregating to 1100 to<br />

2000 MW per year. Currently, FTM can produce steam turbines with capacity up to 660 MW and hydro turbines<br />

with capacity up to 400 MW.<br />

For the six months ended June 30, 2009, the turnover, EBITDA and loss of FTM, as certified by its board of<br />

directors, was €47.35 million, €2.11 million and €2.79 million, respectively.<br />

Some selected ongoing major projects currently undertaken by FTM are set forth below:<br />

84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!