26.10.2012 Views

Statement List (STL) - DCE FEL ČVUT v Praze

Statement List (STL) - DCE FEL ČVUT v Praze

Statement List (STL) - DCE FEL ČVUT v Praze

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Timer Instructions<br />

RLO at enable input<br />

RLO at start input<br />

RLO at reset input<br />

Time response<br />

Check signal state at<br />

timer output.<br />

Load timer: L, LC<br />

I 2.0<br />

I 2.1<br />

I 2.2<br />

Q 4.0<br />

t = programmed time interval<br />

<strong>Statement</strong> <strong>List</strong> (<strong>STL</strong>) for S7-300 and S7-400 Programming<br />

12-6 A5E00706960-01<br />

1<br />

2<br />

t t<br />

(1) A change in the RLO from 0 to 1 at the enable input while the timer is running<br />

completely restarts the timer. The programmed time is used as the current time<br />

for the restart. A change in the RLO from 1 to 0 at the enable input has no effect.<br />

(2) If the RLO changes from 0 to 1 at the enable input while the timer is not running<br />

and there is still an RLO of 1 at the start input, the timer will also be started as a<br />

pulse with the time programmed.<br />

(3) A change in the RLO from 0 to 1 at the enable input while there is still an RLO of<br />

at the start input has no effect on the timer.<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!