Thermal – Achiev<strong>in</strong>g New Efficiencies, Reduc<strong>in</strong>g Carbon Emissions<br />

http://www.pbworld.com/news_events/publications/network/<br />

Ensur<strong>in</strong>g Cont<strong>in</strong>ual <strong>Power</strong> Supply for New York<br />

City Hospitals By Ross Krupnik, New York, New York, 1-212-613-8889, krupnik@pbworld.com; and<br />

Warren Andrews, Atlanta, Georgia, 1-404-364-2650, andrewsW@pbworld.com<br />

Several of New York City’s<br />

hospitals and diagnostic<br />

and treatment centers<br />

needed upgrades to their<br />

power systems to ensure<br />

they would ma<strong>in</strong>ta<strong>in</strong> services<br />

dur<strong>in</strong>g power outages. The<br />

author tells about much of<br />

the research and plann<strong>in</strong>g<br />

PB conducted for these<br />

upgrades and, equally<br />

important, for ensur<strong>in</strong>g that<br />

<strong>in</strong>terruptions to power<br />

were m<strong>in</strong>imized dur<strong>in</strong>g<br />

construction.<br />

Related Web Sites:<br />

• Dormitory Authority of the<br />

State of New York:<br />

www.dasny.org<br />

• New York City Health and<br />

Hospitals Corporation:<br />

www.nyc.gov/hhc<br />

Ross Krupnik, an electrical eng<strong>in</strong>eer,<br />

has a B.S. degree with a double majorelectrical<br />

and computer eng<strong>in</strong>eer<strong>in</strong>g,<br />

and biomedical eng<strong>in</strong>eer<strong>in</strong>g. He<br />

completed his advanced studies <strong>in</strong><br />

electrical eng<strong>in</strong>eer<strong>in</strong>g <strong>in</strong> June 2008.<br />

Ross jo<strong>in</strong>ed PB <strong>in</strong> 2006 and served as<br />

an eng<strong>in</strong>eer on the hospital studies<br />

covered <strong>in</strong> this article.<br />

Warren Andrews, a senior eng<strong>in</strong>eer<strong>in</strong>g<br />

manager and PB vice president, was<br />

program manager for the New York<br />

City hospitals project. He specializes<br />

<strong>in</strong> power design. Warren has been<br />

with PB s<strong>in</strong>ce 1997.<br />

1 Level 1 trauma centers offer the<br />

most comprehensive emergency<br />

medical and surgical services<br />

available to patients suffer<strong>in</strong>g<br />

traumatic <strong>in</strong>juries.<br />

The Northeast Blackout of 2003, the largest power outage <strong>in</strong> North American history, revealed<br />

poorly perform<strong>in</strong>g stand-by emergency generators and emergency power distribution systems<br />

at some of New York City’s hospitals. This event led NYC Health and Hospital Corporation<br />

(NYC HHC), the owner, to have feasibility studies performed for upgrad<strong>in</strong>g emergency power<br />

systems at several of its major hospitals and diagnostic and treatment centers. The follow<strong>in</strong>g<br />

year the Dormitory Authority of the State of New York (DASNY), which acts as NYC HHC’s<br />

agent, reta<strong>in</strong>ed PB to validate the aforementioned feasibility studies and to develop design and<br />

construction documents for upgrad<strong>in</strong>g the emergency systems at n<strong>in</strong>e hospitals—Bellevue,<br />

Coler, Elmhurst, Goldwater, Gouverneur, Harlem, L<strong>in</strong>coln, Queens and Woodhull—and three<br />

diagnostic and treatment centers—Cumberland, Segunda Ruiz Belvis, and Morrisonia.<br />

Bellevue, Elmhurst, Harlem and L<strong>in</strong>coln Hospitals received priority over the other facilities<br />

because they serve as Level 1 trauma centers. 1 At the time of writ<strong>in</strong>g (May 2008), Bellevue<br />

and Elmhurst Hospital projects were <strong>in</strong> the middle of the contractor bidd<strong>in</strong>g process.<br />

PB’s role was similar for each hospital:<br />

• Investigate the site.<br />

• Measure and record exist<strong>in</strong>g runn<strong>in</strong>g loads.<br />

• Perform load analysis.<br />

• Provide a study report to document f<strong>in</strong>d<strong>in</strong>gs and recommendations to address system<br />

deficiencies.<br />

• Meet and correspond with local utility companies to request upgrades <strong>in</strong> utility services.<br />

• Provide bid documents and construction support services to upgrade emergency<br />

systems, <strong>in</strong>clud<strong>in</strong>g replac<strong>in</strong>g and add<strong>in</strong>g generators; synchroniz<strong>in</strong>g generator switchgear;<br />

and <strong>in</strong>corporat<strong>in</strong>g bypass isolation type transfer switches, emergency distribution<br />

switchboards and panelboards.<br />

• Provide bid documents and construction support services to address code violations<br />

associated with the exist<strong>in</strong>g emergency systems and to connect code-required HVAC<br />

equipment to emergency power.<br />

Design Challenges<br />

General Challenge. Implement<strong>in</strong>g electric power upgrades with<strong>in</strong> active hospital facilities<br />

is challeng<strong>in</strong>g, and it is essential that electric power be ma<strong>in</strong>ta<strong>in</strong>ed dur<strong>in</strong>g construction. Even a<br />

partial loss of power can cause severe operational problems along a cha<strong>in</strong> of activities:<br />

• <strong>Power</strong> loss to light<strong>in</strong>g systems can make it impossible to dispense medic<strong>in</strong>e accurately,<br />

carry out precise medical laboratory work or perform surgical procedures.<br />

• <strong>Power</strong> loss to refrigerators stor<strong>in</strong>g tissue, bone or blood can leave the facility without<br />

crucial resources.<br />

• <strong>Power</strong> loss to essential life support equipment, such as heart pumps, medical vacuum<br />

pumps, dialysis mach<strong>in</strong>es, and ventilators, can result <strong>in</strong> loss of life.<br />

Develop<strong>in</strong>g design and construction documents that virtually elim<strong>in</strong>ate <strong>in</strong>terruptions to<br />

electric power dur<strong>in</strong>g construction was paramount. Thorough up-front plann<strong>in</strong>g was essential<br />

so that these documents <strong>in</strong>corporate effective strategies for m<strong>in</strong>imiz<strong>in</strong>g the impact of<br />

construction on hospital operations.<br />

We exercised just such careful plann<strong>in</strong>g for the NYC HHC facilities, and <strong>in</strong>cluded language for<br />

sequenc<strong>in</strong>g construction <strong>in</strong>to design and construction documents for each one. Dur<strong>in</strong>g the<br />