Hydropower – New Technologies, New Considerations<br />

disadvantage, however, particularly <strong>in</strong> larger sizes, where<br />

they can cause large variations <strong>in</strong> voltage and power factor<br />

on the local network. For this reason, the network owner may<br />

have rules about the maximum size of <strong>in</strong>duction generators<br />

allowed to connect, and require power factor correction.<br />

Technical and Economic Feasibility<br />

Once a concept design has been completed and the<br />

transmission aspect <strong>in</strong>vestigated, the eng<strong>in</strong>eer can confirm<br />

whether the scheme is technically feasible. Next should<br />

follow the consideration of economic feasibility. We strongly<br />

recommend that an eng<strong>in</strong>eer prepares the first cut of this<br />

analysis given that eng<strong>in</strong>eer<strong>in</strong>g knowledge is important to the<br />

application of the costs <strong>in</strong> the analysis. In addition, the analysis<br />

process provides important feedback to the eng<strong>in</strong>eer on<br />

the design, and may force a reth<strong>in</strong>k<strong>in</strong>g of some aspects of<br />

the project.<br />

PB has recently undertaken a scop<strong>in</strong>g study for Tillegra Dam<br />

<strong>in</strong> New South Wales, Australia, to determ<strong>in</strong>e what options<br />

are available to recover energy from the environmental flow<br />

discharge. This study has shown that the environmental flow<br />

can be accommodated by a small hydro turb<strong>in</strong>e for m<strong>in</strong>imal<br />

project cost (comparatively speak<strong>in</strong>g); however, a larger turb<strong>in</strong>e<br />

may also be justified to recover energy from some of the<br />

water that would otherwise be spilled past the dam <strong>in</strong> periods<br />

of high lake <strong>in</strong>flows.<br />

Specifications and Conditions of Contract<br />

Specifications should be written by someone who is well<br />

experienced <strong>in</strong> hydro and understands what <strong>in</strong>formation is<br />

required by the tenderers. There is much to be considered<br />

<strong>in</strong> the detail that is beyond the scope of this article; however,<br />

a few key decisions should be made before beg<strong>in</strong>n<strong>in</strong>g.<br />

Q and A<br />

Question:<br />

Would a smaller unit be<br />

sourced as a package?<br />

John Wichall, Senior Consultant,<br />

PB Network Guest Technical Reviewer<br />

Answer:<br />

This is often the case, although<br />

for a recent 250kW unit<br />

the utility preferred a<br />

particular supplier and could<br />

buy the generator<br />

(a Siemens product)<br />

for significantly less money<br />

than the supplier’s<br />

chosen brand.<br />

The first choice is to decide<br />

how the equipment will be<br />

supplied. This <strong>in</strong>cludes<br />

decisions on whether:<br />

• The turb<strong>in</strong>e and generator<br />

will be separate packages<br />

and matched together<br />

at site<br />

• The control and auxiliary<br />

systems will be <strong>in</strong>cluded<br />

with turb<strong>in</strong>e or generator<br />

or be a completely<br />

separate package<br />

• The contract will be an<br />

equipment supply, or<br />

supply and <strong>in</strong>stall, or supply<br />

and supervision type.<br />

http://www.pbworld.com/news_events/publications/network/<br />

Conditions of contract cause many an eng<strong>in</strong>eer to run for cover.<br />

For the value of the contracts considered here, standardised<br />

conditions such as those with<strong>in</strong> the International Federation<br />

of Consult<strong>in</strong>g Eng<strong>in</strong>eers (FIDIC) or the jo<strong>in</strong>t IMechE/IEE<br />

Committee Model Forms of General Conditions of Contract<br />

(e.g., MF1 or MF2) should be used. It is strongly recommended<br />

that no modifications be made to the standard conditions,<br />

and that any particular issues be covered only <strong>in</strong> the special<br />

conditions. The special conditions should cover penalties for<br />

non-performance and must be reasonable, otherwise they will<br />

adversely impact the tendered prices.<br />

Overall the commercial conditions should not substantially<br />

outweigh the technical specifications. A lightweight specification<br />

will not be fixed by heavy-handed commercial clauses and<br />

general ignorance of the requirements for a successful m<strong>in</strong>i hydro.<br />

In the last year, we completed the technical specification for<br />

the turb<strong>in</strong>e and generator for the Gippsland Water Factory<br />

<strong>in</strong> Victoria, Australia. 1 The turb<strong>in</strong>e will replace a pressure<br />

reduc<strong>in</strong>g valve that is currently used to dissipate the energy<br />

<strong>in</strong> the raw water supply before return<strong>in</strong>g it to a reservoir.<br />

This project is an example of how exist<strong>in</strong>g <strong>in</strong>frastructure can<br />

be modified at relatively low cost to capture the otherwise<br />

wasted energy and convert it to electricity. Some of the<br />

generated energy is then used at the nearby water factory.<br />

When completed, this project will provide a susta<strong>in</strong>able energy<br />

source that will reduce energy costs at the facility and, <strong>in</strong> the<br />

long run, will benefit the community.<br />

Tenders and Tender Evaluation<br />

Tenderers must be given sufficient time to write their<br />

tenders. This should be a m<strong>in</strong>imum of one month for small<br />

jobs, and up to several months for more complex jobs,<br />

such as those requir<strong>in</strong>g civil works or the supply and <strong>in</strong>stall<br />

of the entire scheme.<br />

We believe economis<strong>in</strong>g on the turb<strong>in</strong>e/generator set is unwise.<br />

As with most electromechanical equipment, <strong>in</strong>creased quality<br />

and efficiency is matched by <strong>in</strong>creased price. There are some<br />

very good manufacturers who ma<strong>in</strong>ta<strong>in</strong> the latest <strong>in</strong> computational<br />

fluid dynamics (CFD) programs and hydraulic test<br />

programs. In general, their equipment will be more efficient<br />

then that produced by manufacturers with less sophisticated<br />

design and equipment. Economic analysis of the capital and<br />

life time operat<strong>in</strong>g costs, as mentioned earlier, is essential to<br />

discern whether additional revenue from higher efficiency<br />

and reliability is compensated by the higher capital cost.<br />

Readers are warned to beware of suppliers claim<strong>in</strong>g efficiency<br />

<strong>in</strong> the top of the range that large turb<strong>in</strong>es typically<br />

(page 37)<br />

1 To learn more about the Gippsland Water Factory, see "Water Factory Will Help<br />

to Address Water Shortage Concerns" by Tony Mulholland, pp.94-95.<br />

PB Network #68 / August 2008 26