TRANSMISSION AND DISTRIBUTION:<br />

Transport<strong>in</strong>g <strong>Power</strong> Across the Grid<br />

Electricity Transmission:<br />

Build<strong>in</strong>g on 120 Years of Experience<br />

S<strong>in</strong>ce 1899, PB has been <strong>in</strong>volved <strong>in</strong> all aspects of electrical power transmission, rang<strong>in</strong>g<br />

from feasibility studies and design of <strong>in</strong>dustrial and rail transportation systems to large<br />

power utility systems. The scope of the transmission projects we have undertaken recently<br />

is vast, and <strong>in</strong>cludes:<br />

• System studies of power flow, fault level, stability and <strong>in</strong>sulation co-ord<strong>in</strong>ation; and<br />

implementation of schemes to maximise power transmission levels<br />

• Control of system voltage and power flows under normal and faulted situations<br />

• Design of overhead l<strong>in</strong>es and substations<br />

• Development and implementation of transmission and sub-transmission projects.<br />

Some specific projects <strong>in</strong>clude the development of the first 500 kV transmission network <strong>in</strong><br />

Indonesia; expansion and refurbishment of the 400, 275, 132 kV networks <strong>in</strong> Orissa, India;<br />

specification, approval and supervision of the first 500 kV system <strong>in</strong> Argent<strong>in</strong>a, the Northern<br />

Ireland Interconnector 275 kV transmission system; the Merowe Dam Project 500 kV/220 kV<br />

transmission and substation <strong>in</strong> Sudan, the; 500 kV transmission l<strong>in</strong>e and substation for the 1200<br />

MW Illijan <strong>Power</strong> Plant <strong>in</strong> the Philipp<strong>in</strong>es; and the feasibility study for develop<strong>in</strong>g an off-shore<br />

HVDC network to <strong>in</strong>terconnect renewable energy sources for transmission to UK load centres.<br />

The articles <strong>in</strong> this section illustrate the breadth of the technical knowledge and expertise<br />

with<strong>in</strong> PB <strong>in</strong> creat<strong>in</strong>g <strong>in</strong>novative solutions geared towards the maximisation of exist<strong>in</strong>g assets<br />

necessary <strong>in</strong> transmitt<strong>in</strong>g power across the grid. PB’s role as a lender eng<strong>in</strong>eer is demonstrated<br />

<strong>in</strong> the first article by Fleur Park<strong>in</strong>son about a power transmission project <strong>in</strong> Cambodia. This<br />

project enabled PB to draw on one of its strengths: the adoption of a multidiscipl<strong>in</strong>ary approach<br />

and <strong>in</strong>volvement of eng<strong>in</strong>eers across different national boundaries to address the challenges<br />

of that project. The second article by M.R. Jayasimha describes the upgrad<strong>in</strong>g of the Abu<br />

Dhabi transmission network to 400 kV due to <strong>in</strong>crease <strong>in</strong> load growth.<br />

HVDC technology has been used to transport powers over long distances us<strong>in</strong>g cables. The<br />

next article by Paul Tuson proposes a possible HVDC transmission l<strong>in</strong>k so that the power<br />

utilities with<strong>in</strong> the South African Development Community countries can take advantage of<br />

availability of fuel resources to supply power at m<strong>in</strong>imum cost, improve system reliability and<br />

maximise reserve marg<strong>in</strong>s. This section concludes with an article by Conor Reynolds illustrat<strong>in</strong>g<br />

the far-sightedness of some of our specialists who developed an accurate and cost-efficient<br />

network assessment programme for transmission networks, but can be equally effective for<br />

other applications with<strong>in</strong> the power <strong>in</strong>dustry.<br />

Please see page 89 for a list of several articles on transmission projects from past PB publications.<br />

Arthur Ekwue<br />

Pr<strong>in</strong>cipal <strong>Power</strong> Systems Eng<strong>in</strong>eer, Godalm<strong>in</strong>g, UK<br />

Coord<strong>in</strong>ator of PAN 57, <strong>Power</strong> System Analysis, Plann<strong>in</strong>g & Restructur<strong>in</strong>g<br />

PB Network #68 / August 2008 58