Hydropower – New Technologies, New Considerations<br />

The OASIS model and how it was used evolved dur<strong>in</strong>g the<br />

consultation process. Initially,Tapoco and the stakeholders<br />

developed alternatives <strong>in</strong>dependent of the model and evaluated<br />

the alternatives <strong>in</strong> an office sett<strong>in</strong>g. We first used the model<br />

to simulate a “base case” condition, which was the Tapoco<br />

project with current operat<strong>in</strong>g rules <strong>in</strong> effect. Next, we<br />

simulated alternative operat<strong>in</strong>g scenarios and the results for<br />

each alternative (estimated reservoir water levels, stream<br />

flows, generation, and value of generation) were compared<br />

to the base case.<br />

As Tapoco moved <strong>in</strong>to formal negotiations with stakeholders,<br />

OASIS was used more <strong>in</strong> real-time discussions. Dur<strong>in</strong>g<br />

negotiations, the stakeholders discussed the model results<br />

and requested modifications to the alternatives. We made<br />

modifications and ran OASIS real-time at meet<strong>in</strong>gs, and<br />

presented and discussed the prelim<strong>in</strong>ary results. After the<br />

meet<strong>in</strong>gs, we verified the prelim<strong>in</strong>ary results and obta<strong>in</strong>ed<br />

f<strong>in</strong>al results. If there were any notable differences between<br />

the two, then the f<strong>in</strong>al results were distributed to stakeholders<br />

via e-mail with<strong>in</strong> a few days. This approach kept the<br />

pace mov<strong>in</strong>g quickly for all those <strong>in</strong>volved <strong>in</strong> the<br />

settlement process.<br />

http://www.pbworld.com/news_events/publications/network/<br />

Us<strong>in</strong>g OASIS to evaluate alternative operat<strong>in</strong>g scenarios <strong>in</strong><br />

a real-time environment proved to be key to reach<strong>in</strong>g a<br />

negotiated settlement between Tapoco and the stakeholder<br />

coalitions. FERC issued a new license implement<strong>in</strong>g the<br />

agreement <strong>in</strong> January 2005. This license and the associated<br />

settlement agreement were critical to Alcoa’s cont<strong>in</strong>ued<br />

operation of the smelter facility located at Alcoa,Tennessee. <br />

Paul Shiers is a PB vice president with 38 years’ experience <strong>in</strong> hydroelectric<br />

power and water resource eng<strong>in</strong>eer<strong>in</strong>g. He is qualified as an <strong>in</strong>dependent consultant<br />

and PFMA facilitator for FERC Part 12 safety <strong>in</strong>spections under the new FERC<br />

DSPMP requirements. He has served as project manager for multiple hydropower<br />

projects, and completed an assignment as pr<strong>in</strong>cipal eng<strong>in</strong>eer for work performed<br />

under a multi-year cont<strong>in</strong>u<strong>in</strong>g services agreement with FERC as the senior technical<br />

resource for hydro relicens<strong>in</strong>g and compliance tasks.<br />

Shirley Williamson is a senior supervis<strong>in</strong>g civil eng<strong>in</strong>eer with 29 years’ experience<br />

<strong>in</strong> hydropower. She has been responsible for several NEPA-based environmental<br />

assessments rang<strong>in</strong>g <strong>in</strong> size from the 35-plant Tennessee Valley Authority system to<br />

an <strong>in</strong>dividual 2.5 MW facility under FERC jurisdiction. In addition, Shirley has<br />

developed and implemented reservoir operations studies, flood studies, and project<br />

safety response plans and tra<strong>in</strong><strong>in</strong>g programs for owners of hydroelectric facilities,<br />

<strong>in</strong>clud<strong>in</strong>g <strong>in</strong>terfac<strong>in</strong>g with owners and public safety agency staff.<br />

Chii-Ell Tsai is a supervis<strong>in</strong>g eng<strong>in</strong>eer with 44 years’ eng<strong>in</strong>eer<strong>in</strong>g experience.<br />

His water resources activities have <strong>in</strong>clude: OASIS model<strong>in</strong>g; spillway adequacy<br />

evaluation and stability analysis; water profiles and evaluation of power and<br />

energy for a proposed hydroelectric project; the preparation of emergency action<br />

plans for dam failure; and studies of energy consequences of modified reservoir<br />

operation policies on generation.<br />

Plann<strong>in</strong>g for M<strong>in</strong>i Hydro... (cont<strong>in</strong>ued from page 26)<br />

achieve. These suppliers are more than likely exaggerat<strong>in</strong>g<br />

their mach<strong>in</strong>es’ capabilities. Unfortunately, efficiency claims<br />

are difficult to verify before the asset is <strong>in</strong>stalled because<br />

model efficiency tests are simply not cost effective for<br />

mach<strong>in</strong>es of this capacity. Ideally, the supplier has either built<br />

a turb<strong>in</strong>e close to the head and flow available at the site<br />

from which the efficiency can then be based on, or has completed<br />

a model test of a similar turb<strong>in</strong>e as part of the development<br />

process. In any case, tenderers should be asked how<br />

they derived the efficiency figures presented <strong>in</strong> the tender.<br />

In most cases, verification to site efficiency test codes, such<br />

as IEC600041, can occur only once the turb<strong>in</strong>e is at site. The<br />

measurement accuracy can be expected to be about 2 percent<br />

at best. Compensation from the supplier for an underperform<strong>in</strong>g<br />

turb<strong>in</strong>e will normally be capped at a maximum of 10 percent<br />

of the value of the contract, which may not provide adequately<br />

for the lost revenue over the life of the equipment. This po<strong>in</strong>t<br />

further emphasises the need for caution when evaluat<strong>in</strong>g tenders.<br />

Conclusions<br />

Hydro is an essential part of the renewable generation mix of<br />

the future, even though some consider it to be “old technology.”<br />

As we know, plann<strong>in</strong>g is the key to the success of a project.<br />

I hope this article has provided useful <strong>in</strong>sight <strong>in</strong>to the<br />

development <strong>in</strong> small hydro.<br />

<br />

Q and A<br />

Question:<br />

What measures were adopted <strong>in</strong> the selection of bidders,<br />

specification or bid evaluation process to screen our<br />

poor quality or performance?<br />

John Wichall, Senior Consultant, PB Network Guest Technical Reviewer<br />

Answer:<br />

That is a bit of a complex subject to get <strong>in</strong>to here,<br />

as this topic could be an article <strong>in</strong> itself. As a m<strong>in</strong>imum,<br />

bid evaluation should focus on reputation, referees, technical<br />

compliance with the specification, and performance<br />

(weighted efficiency) of the turb<strong>in</strong>e for the smallest turb<strong>in</strong>es.<br />

Then many other factors need to be considered, such as<br />

long-term operat<strong>in</strong>g cost, non-price attributes etc.<br />

Non-price attributes generally cause havoc with tender evaluation,<br />

and I am a subscriber to the view that if you can’t ascribe<br />

a value or potential value, then it should not be <strong>in</strong>cluded<br />

<strong>in</strong> your evaluation (e.g., no po<strong>in</strong>ts system). The non-price attributes,<br />

cost adjustments, plus the performance evaluation can be<br />

added to the tender price to identify the “best” tender.<br />

Tony Mulholland, a mechanical eng<strong>in</strong>eer who has been with PB for more than two<br />

years, has played a key role <strong>in</strong> all phases of several m<strong>in</strong>i-hydro facilities, be<strong>in</strong>g<br />

<strong>in</strong>volved <strong>in</strong> plann<strong>in</strong>g, design, and construction. He also has extensive experience <strong>in</strong><br />

other hydro-electric projects, and has a keen <strong>in</strong>terest <strong>in</strong> renewable energy sources.<br />