Transport<strong>in</strong>g <strong>Power</strong> Across the Grid<br />

http://www.pbworld.com/news_events/publications/network/<br />

Rehabilitation and Reconstruction of Abu Dhabi<br />

Transmission Network By M.R. Jayasimha, Abu Dhabi, 971 50 4554907, jayasimhaM@pbworld.com<br />

The author tells how PB is<br />

assist<strong>in</strong>g Abu Dhabi Water<br />

and Electricity Authority<br />

to further enhance the<br />

reliability of the emirate’s<br />

transmission and distribution<br />

network. He focuses on<br />

a modification to the<br />

switchgear and replacement<br />

of power transformers and<br />

a substation.<br />

Abu Dhabi’s electricity transmission network was established <strong>in</strong> the early 1970s at ma<strong>in</strong>ly<br />

220 kV and 132 kV levels. S<strong>in</strong>ce then, the country’s rapid rates of growth and development<br />

and characteristic high <strong>in</strong>creases <strong>in</strong> load demand have led to an expansion of the network and<br />

upgrad<strong>in</strong>g to 400 kV. In addition, the Abu Dhabi Water and Electricity Authority (ADWEA)<br />

<strong>in</strong>itiated a repair and rehabilitation project <strong>in</strong> 1999 to further enhance the reliability of the<br />

exist<strong>in</strong>g power transmission and distribution network. 1<br />

PB was selected as consultant for this important and technically complicated project. Once<br />

we completed the first phase of the project by 2002, we were awarded an extension for the<br />

second phase, which <strong>in</strong>cluded new substations and a new scope of services for the rehabilitation<br />

and replacement of exist<strong>in</strong>g switchgear <strong>in</strong> transmission substations.<br />

Start<strong>in</strong>g <strong>in</strong> January 2003, seven construction contracts worth US $70 million were awarded.<br />

These contracts <strong>in</strong>cluded:<br />

• S<strong>in</strong>gle to double bus bar modification of 13 2kV gas <strong>in</strong>sulated switchgear (GIS) <strong>in</strong> five substations<br />

• Replacement of ten 132/11 kV 40 MVA power transformers<br />

• Replacement of the exist<strong>in</strong>g 132 kV substation <strong>in</strong> the Taweelah <strong>Power</strong> Station Complex. 2<br />

S<strong>in</strong>gle to Double Bus Bar Modification<br />

The s<strong>in</strong>gle to double bus bar modification of 132 kV GIS <strong>in</strong> five energised substations<br />

was a very specific and demand<strong>in</strong>g task. The GIS <strong>in</strong> these substations was already <strong>in</strong><br />

service for up to twenty years. The modification works required partial and <strong>in</strong> some<br />

cases complete shutdowns of the substation. The works were planned dur<strong>in</strong>g the<br />

w<strong>in</strong>ter season because dur<strong>in</strong>g the summer <strong>in</strong> Abu Dhabi maximum system demand<br />

occurs due to the high air condition<strong>in</strong>g loads. In one of the substations, the bus bar<br />

protection was replaced with numerical low impedance busbar protection dur<strong>in</strong>g the<br />

modification works. In the other four substations, exist<strong>in</strong>g low impedance busbar<br />

protection was adapted for double bus bar type switchgear. Of the three types of<br />

switchgear to be modified, manufacturers had discont<strong>in</strong>ued production of two of them.<br />

The busbar and isolator modules required for this modification were manufactured<br />

specifically for this purpose by the orig<strong>in</strong>al equipment manufacturers. Figure 1 shows<br />

the switchgear before and after the modification.<br />

Replacement of <strong>Power</strong> Transformers<br />

Figure 1: W59 substation before s<strong>in</strong>gle to<br />

double bar modification of 132kV GIS (top)<br />

and after (bottom).<br />

For the replacement of ten age<strong>in</strong>g 132 kV/11 kV 40 MVA power transformers, the<br />

design of the new power transformers was adopted to suit the exist<strong>in</strong>g transformer<br />

compound dimensions and the length of the exist<strong>in</strong>g high voltage cables. The<br />

opportunity was taken to also replace the transformer protection relays with latest<br />

numerical protection relays. In one of the GIS substations, a bus reactor bay was<br />

modified to provide a fourth 40MVA transformer. Ten new 11 kV feeders were also<br />

provided <strong>in</strong> this substation to receive power from the newly <strong>in</strong>stalled transformer.<br />

Exist<strong>in</strong>g 132 kV cables were reused provid<strong>in</strong>g new term<strong>in</strong>ations at the transformer end,<br />

(page 67)<br />

1 For more <strong>in</strong>formation about Abu Dhabi Water and Electricity Authority’s (ADWEA’s) <strong>in</strong>troduction of control systems <strong>in</strong> its transmission substations and PB’s <strong>in</strong>volvement <strong>in</strong> this<br />

work, please read “Experiences and Trends <strong>in</strong> Automat<strong>in</strong>g Transmission Substations <strong>in</strong> Abu Dhabi” by Oleg Matic <strong>in</strong> PB Network’s 20th Anniversary issue (Issue 66), pp. 88-89. or<br />

on the the Web at http://www.pbworld.com/news_events/publications/network/issue_66/pdf/66_37_Matic_ExperiencesAndTrends.pdf<br />

Another of ADEWA’s projects to augment Abu Dhabi’s electricity supply is covered <strong>in</strong> “400 kV Interconnection of Abu Dhabi Island” by Walter Bullock, PB Network Issue 65,<br />

pp.79-80 or on the Web at http://www.pbworld.com/news_events/publications/network/Issue_65/pdf/079.pdf<br />

2 For <strong>in</strong>formation about the use of a PB <strong>in</strong>vention that cut fuel consumption at the Taweelah complex, see “How <strong>Innovation</strong> Can Open Market Opportunities” by Paul M. Willson,<br />

PB Network Issue 63, pp 71-72 and on the Web at http://www.pbworld.com/news_events/publications/network/issue_63/63_26_willson_how<strong>in</strong>novationcanopen.asp<br />

PB Network #68 / August 2008 62