County: Dona Ana<br />
Dona Ana County<br />
CPB No: SAP 11-1297-STB<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Deal, Steven Grant Amount: $600,000.00<br />
Population Served by This Project 12,000 Loan Amount: $0.00<br />
Project Phase: Planning Phase Fund Balance: $526,542.30<br />
Problem:<br />
Solution:<br />
Project:<br />
Upgrades needed for wastewater infrastructure in the Camino Real Regional Utility Authority<br />
(CRRUA) service area.<br />
A Preliminary Engineering <strong>Report</strong> (PER) is being written to assess the area needs.<br />
to plan, design, construct and equip a wastewater treatment facility serving the Santa<br />
Teresa port of entry, industrial areas and surrounding communities in Doña Ana County<br />
Notice of Obligation for $165,123.47 including NMGRT completed. SD 04/05/12; The Preliminary Engineering<br />
<strong>Report</strong> has reached about 50% completion. SD 11/16/12 The Preliminary Engineering <strong>Report</strong> is approaching 90%<br />
completed, and NMED CPB completed a review at 60%. SD 12/11/12<br />
County: Dona Ana<br />
Dona Ana County<br />
CPB No: SAP 12-1602-GF<br />
Funding:<br />
Project Amount<br />
SAP Grants<br />
CPB Manager: Deal, Steven Grant Amount: $20,000.00<br />
Population Served by This Project 250 Loan Amount: $0.00<br />
Project Phase:<br />
Problem:<br />
Solution:<br />
Project:<br />
Design Phase<br />
The San Miguel community needs a reliable water supply.<br />
Insufficient funds were supplied to complete the project, and additional funds could not be<br />
secured over the grant lifetime.<br />
for water system improvements in San Miguel in Dona Ana County<br />
$0.00<br />
$0.00<br />
Fund Balance: $20,000.00<br />
To plan, design, purchase and construct water system improvements including drilling a well in San Miguel in Dona<br />
Ana county. Grant Agreement executed 9/30/2008. DAC plans to use these funds to equip a new well drilled for<br />
the water Association in San Miguel. SD 7/9/12 <strong>New</strong> <strong>Mexico</strong> <strong>Environment</strong> Department Construction Programs<br />
Bureau (NMED CPB) has received the grant agreement, and a contract to use the funds for engineering services<br />
is in negotiation. In the meantime, the construction plans have been reviewed and comments returned. It is<br />
expected that these funds will be quickly expended. SD 12/11/12<br />
County: Dona Ana<br />
Dona Ana County<br />
CPB No: WTB-190<br />
Funding:<br />
Project Amount<br />
WTB<br />
$6,544,000.00<br />
CPB Manager: Deal, Steven Grant Amount: $6,544,000.00<br />
Population Served by This Project 4,258 Loan Amount: $0.00<br />
Project Phase: Construction Fund Balance: $6,544,000.00<br />
Problem: Santa Teresa Water System has elevated arsenic levels - above the USEPA Maximum<br />
Contaminant Limit (MCL).<br />
Solution: Construct an arsenic treatment facility similar to that found in Sunland Park to remove arsenic to<br />
bring the system back into compliance.<br />
Project: Water Conservation, Treatment, Recycling or Reuse<br />
The majority of the funding will be used to build the second of three Arsenic Treatment Plants in the border region.<br />
Project has bid and been awarded to Bradbury Stamm Construction and is in the preliminary construction stages.<br />
1/5/12 SD<br />
NMFA MOU expired June 30, 2012. No activity by CPB pending new MOU. 12/11/12 SD<br />